Exterior Dry Wash at Nürnberg (EDDN)
Rinseless detailing at the GAT apron—no runoff, no bay queues, and overnight turnarounds when you need them.
Exterior Dry Wash at Nürnberg suits flight departments and charter operators that keep their aircraft presentable between deep cleans, or that need a quick cosmetic turnaround on the ramp without moving to a wash bay. AirPart GmbH, the airport's handling subsidiary, staffs the General Aviation Terminal around the clock, so we can work overnight or on weekends if your slot or crew duty-time requires it. The aircraft stays on stand; we bring aviation-approved waterless products, remove bug strike, exhaust soot and hydraulic film from the fuselage, wings, empennage and nacelles, degrease the belly and gear bays, and touch up brightwork on leading edges—all with no runoff and no environmental hold.
10/28 · 2700 m
AIP and airport data1044 ft
Airport licensed for 24/7 operations; handling agent AirPart GmbH staffed 24/7; General Aviation Terminal desk open Mon-Fri 06:00-21:30 CET and Sat/Sun/bank holidays 08:30-18:00 CET
5 km
Nuremberg city centre (airport lies north of the city)1 on the airport
independent, no affiliationGeneral Aviation Terminal (GAT) at Flughafenstr. 100, operated by the airport's handling subsidiary AirPart GmbH (tel. +49 911 937 1576)
What does a dry wash deliver at the General Aviation Terminal?
You get a complete exterior wipe-down with polymer-bearing rinseless chemistry that lifts and encapsulates dirt without high-pressure water. We start at the nose—radome, windscreen, forward fuselage—then work aft along the cheat line and over the wings, paying attention to bug residue on leading edges and nacelle inlets. The empennage, belly and main-gear bays are degreased with citrus-based aviation cleaners; we wipe down all exterior windows, position lights and strobes, and finish with a light brightwork touch-up where oxidation or exhaust staining has dulled the aluminium.
The result is not a mirror polish—that requires a single-stage machine correction—but it is a marked improvement in appearance and a proven way to protect the paint between full details. Most operators on a monthly or bi-monthly schedule find that a dry wash keeps the aircraft looking sharp for passengers and prevents the build-up of corrosive exhaust salts, especially around APU exhausts and over the tail cone.
Duration depends on size: a super-midsize takes three to four hours; an ultra-long-range airframe with tall T-tail and large winglets will stretch toward eight. We work on the apron or the GAT hardstand, so you avoid wash-bay queues and the aircraft is ready to taxi as soon as the tech log is signed.
What changes at Nürnberg that affects scheduling and access?
Nuremberg sits at 1 044 feet elevation, five kilometres north of the city centre, with a single 2 700-metre runway served by the General Aviation Terminal at Flughafenstr. 100. Unlike most German airports, Nürnberg is licensed for 24/7 operations: night passenger flights run during the summer peak, and cargo, general-aviation and military movements continue through the small hours in winter. AirPart GmbH, the handling agent and GAT operator, is staffed around the clock, so overnight ramp work—including exterior cleaning—is operationally possible if your inbound arrives late or you want the aircraft ready at first light.
Nuremberg is a Level 2 'schedules facilitated' airport under FHKD coordination, but Universal Weather lists no slot requirement for business aviation, and the GAT desk (open Monday to Friday 06:00–21:30 and weekends 08:30–18:00 CET) will coordinate a stand and any PPR paperwork. The handler holds IATA AHM 804 and ISAGO certification, so they know what a third-party detailing crew needs: airside escort if our team does not hold a local pass, GPU or APU run clearance if we are working around avionics bays, and a small exclusion zone on the apron to keep ground equipment and tow tractors clear of our kit.
Winter in Franconia is cold and damp—paint stays cold-soaked well into March—so any polymer sealant we apply cures slowly and may not reach full hydrophobicity for twenty-four hours. Summer heat accelerates curing but also means more insect strikes on the nose and leading edges, so operators flying in and out of Nürnberg between May and September often book a dry wash every three weeks rather than four.
How does a handler treat a third-party appearance crew on the ramp?
AirPart expects a short briefing: who you are, which aircraft, how long you will be on stand, and whether you need GPU power or access to the APU. If our technician does not hold a permanent Nürnberg airside pass, the handler will assign an escort; that escort stays within sight but does not interfere with the work. We bring our own water (five to ten litres for a dry wash, all of it captured in microfibre), so there is no demand on the hydrant truck and no drainage question.
The handler will also want to see your insurance certificate and a method statement if this is the first visit, but once you are in their system as a recurring vendor the process reduces to a quick radio call when you arrive airside. If the aircraft is due to depart within two hours of our finishing, the handler may ask us to stay on the apron until the captain has done his walk-around, in case a smear or missed panel needs a touch-up before engine start.
When does recurring dry-wash make sense at a Nuremberg base?
If your aircraft overnights at Nürnberg more than twice a month, a standing dry-wash order—say, every third visit or every four weeks—keeps the exterior consistently clean and spreads the cost across the operating budget rather than hitting it in one large invoice twice a year. The General Aviation Terminal apron is compact, so the handler knows which tail numbers are regulars; they will often park a recurring customer on the same stand, which makes our logistics simpler and means we can pre-position kit in a corner of the GAT if the handler agrees.
Recurring work also lets us track the condition of the paint: we note any new chips on the leading edges, any hydraulic weeps near actuator doors, and any areas where exhaust soot is baking onto the tail cone despite regular cleaning. That information goes into a short report after each visit, so the chief pilot or maintenance controller can see trends and decide when a full correction polish or a touch-up respray is due.
One-off cleans remain common for charter operators whose routing through Nuremberg is irregular, or for an owner who wants the aircraft looking sharp before a specific trip. In those cases we coordinate the date and stand location with AirPart a few days in advance, and the process is identical—just without the standing purchase order and the historical record.
What does Franconian weather do to paint and how does a dry wash help?
Nuremberg's continental climate delivers cold, overcast winters with occasional snow, and warm summers broken by thunderstorms that leave the airframe covered in rain spots and dried pollen. Winter road salt—blown onto the apron by jet blast and rotor wash—settles into panel gaps and around the belly; if it is not removed it will wick moisture and start corrosion under the paint edge. Summer brings dense clouds of midges and moths around the runway thresholds at dusk, so a night departure or an early-morning arrival often means a nose and wing leading edge thick with bug strike.
A dry wash tackles both: the rinseless chemistry is pH-neutral and safe for all OEM paint systems, but strong enough to dissolve road-salt residue and break down the proteins in dried insect matter. We work the leading edges with a dedicated bug sponge and a citrus pre-spray, then follow with a polymer-bearing final wipe that leaves a hydrophobic film; that film sheds the next rain shower and makes the subsequent clean faster.
The 24/7 handler access means we can schedule the wash for late evening in summer, when the airframe has cooled and the polymer cures overnight, or for mid-morning in winter when the sun has lifted the surface temperature above five degrees and the product will bond properly. Either way, the paint stays protected and the aircraft stays off the corrosion watch-list.
Why choose waterless over a traditional wash bay at Nürnberg?
Speed and simplicity. A wash bay requires a tow from the GAT apron to the maintenance area, a queue if another aircraft is already in the bay, and a second tow back to stand once the aircraft is dry. That adds an hour to ninety minutes of ground time, and it requires the handler to allocate a tug and a headset-equipped wing-walker. A dry wash happens on stand: we arrive, the handler escorts us to the aircraft, and we start work. When we finish, the aircraft is ready to taxi.
Waterless cleaning also eliminates runoff, which matters at airports where wash-water must be captured and treated. Nürnberg has no specific prohibition, but some operators prefer the simplicity of a no-discharge method, especially if the aircraft will reposition to another European field with stricter environmental rules immediately afterward. Finally, a dry wash is kinder to cold-soaked paint in winter: there is no thermal shock from warm wash water hitting a frozen leading edge, and no risk of water pooling in a static port or pitot tube if the covers were left off.
Questions operators ask about Exterior Dry Wash at Nürnberg
How long does a dry wash take at the General Aviation Terminal?
Three to four hours for a super-midsize, up to eight hours for an ultra-long-range airframe with tall empennage. Duration depends on aircraft size and how soiled the exterior is. A clean super-midsize in regular service takes three to four hours; a large-cabin jet with high T-tail, winglets and a long belly will stretch toward eight. We work continuously, so the aircraft is ready to taxi as soon as we sign the tech log.
Can you work overnight at Nürnberg?
Yes—the airport is licensed for 24/7 operations and AirPart GmbH is staffed around the clock. Nuremberg is one of the few German airports licensed for night operations year-round, and the handling agent is on duty twenty-four hours a day. If your inbound arrives late or you want the aircraft clean by first light, we can coordinate an overnight dry wash with the handler and work under apron lighting.
Do I need to move the aircraft to a wash bay?
No—we perform the dry wash on stand at the GAT apron, with no tow and no bay queue. The aircraft stays on its assigned stand. We bring all equipment and chemistry to the ramp, so you avoid the delay and cost of a tow to a wash facility. The handler simply escorts us airside, and we start work.
What does the handler need from you before you start?
A short briefing, insurance certificate, and an airside escort if our technician lacks a local pass. AirPart GmbH will ask which aircraft we are cleaning, how long we will be on stand, and whether we need GPU or APU access. If this is our first visit, they will request an insurance certificate and a method statement; recurring visits require only a radio call when we arrive airside.
Does a dry wash remove all bug strike and exhaust soot?
Yes—we use aviation-approved bug remover and citrus degreasers that lift organic residue and carbon deposits. Leading edges, nacelle inlets and the nose radome are treated with a dedicated bug pre-spray and scrubbed with a soft sponge. Exhaust soot around the APU outlet and tail cone is removed with citrus-based degreasers. Stubborn baked-on deposits may need a second pass, but the result is a clean, protected surface.
How often should I schedule a dry wash at a Nuremberg base?
Every two to four weeks for aircraft in regular service, or before any high-profile trip. Flight departments that overnight at Nürnberg twice a month or more typically book a dry wash every third visit or every four weeks. That interval keeps the paint clean, prevents the build-up of corrosive road salt in winter, and spreads the cost across the operating budget.
Will the polymer sealant cure properly in winter?
Yes, but it cures slowly when the airframe is cold-soaked—we schedule the wash for mid-morning when possible. Cold paint below five degrees Celsius slows the cross-linking of the polymer, so full hydrophobicity may take twenty-four hours to develop. We prefer to work mid-morning in winter, after the sun has lifted the surface temperature, and we advise operators to avoid heavy rain for the first day after application.
Can you clean the belly and landing-gear bays?
Yes—we degrease the belly, gear bays and wheel wells as part of every exterior dry wash. The belly and main-gear bays collect hydraulic mist, oil and road grime. We use citrus-based aviation degreasers and microfibre pads to remove the film, then wipe down the gear struts and wheels. The result is a cleaner belly and less risk of corrosion in the bays.
Is there any water runoff or environmental paperwork?
No—a dry wash uses five to ten litres of water, all captured in microfibre, with zero runoff. Waterless cleaning eliminates the need for wash-bay drainage and environmental permits. We bring our own water in small quantities, and every drop is absorbed into our microfibre towels and disposed of off-site. The handler appreciates the simplicity, and you avoid any discharge questions.
What happens if I need the aircraft back in service quickly?
We work to your departure slot—if time is tight, we prioritise the visible surfaces and sign off the tech log on schedule. If a tight turnaround or an unexpected PPR slot compresses the window, we focus on the fuselage, wings and empennage first, then tackle the belly and gear bays if time permits. The handler will radio us when the crew is ready for their walk-around, and we clear the stand on time.