Call now Book a Service
EDMA · AGB · Augsburg, Germany

Fleet Care Program at Augsburg (EDMA)

Twelve-month appearance plan for based fleets at a daytime business-aviation field in southern Germany

The Fleet Care Program at Augsburg (EDMA) is a twelve-month appearance contract built for corporate flight departments, charter operators and FBOs with aircraft based or frequently rotating through this southern German airport. The program assigns a single contact, a fixed monthly budget per tail and a service calendar that flexes around your flight schedule, covering quick turns between legs, monthly cabin deep-cleans, seasonal exterior washes and brightwork correction. Because Augsburg operates daytime hours with a PPR-only curfew and carries almost no scheduled airline traffic, turnaround slots follow business-aviation rhythms and fleet-care visits can be timed to maintenance windows at the on-site Augsburg Air Service hangars without competing for stand space.

Runway

07/25 · 1594 m

AIP and airport data
Elevation

1515 ft

Operating hours

Mon-Sat 07:00-21:00 local, Sun/public holidays 09:00-21:00 local (AC-U-KWIK: M-Sa 0600-2000Z, Su 0800-2000Z, otherwise PPR)

Airport is not open 24 h: movements before 07:00 (Mon-Sat), before 09:00 (Sun/holidays) or after 21:00 (daily) only with chargeable PPR
Distance

7 km

Augsburg city centre (north-east of the city; Wikipedia 7 km, AC-U-KWIK 7 km, Universal 6.6 km)

What changes at Augsburg for a fleet-care crew?

Augsburg sits at 1515 feet elevation, seven kilometres north-east of the city centre, with a single 1594-metre runway serving almost entirely general and business aviation. Published operating hours are Monday to Saturday 07:00–21:00 local, Sunday and public holidays 09:00–21:00; any movement before 07:00 (or 09:00 on Sundays) or after 21:00 requires a chargeable PPR arranged with the airport. That daytime-only rhythm shapes fleet-care scheduling: if you want an overnight interior or an early-morning pre-departure dry wash, the airport must approve the slot in advance, and the fee becomes part of the monthly budget.

Because there is no scheduled airline service, ramp access and stand allocation follow business-aviation tempo rather than wave timing. Customs and border police are on site, so international arrivals clear directly at Augsburg without diversion. Hangar space exists—heated and unheated hangars of 75 × 25 metres and 75 × 20 metres, built for aircraft up to 6.50 metres tall and 25 metres long, plus a newer business-aviation hangar completed in 2014—but free slots are sporadic, so indoor washing or polishing cannot be assumed and must be requested case-by-case through the program contact.

Augsburg Air Service, part of the Atlas Air Service group, operates a business-jet maintenance base on the field with several hangars covering Embraer, Citation, Beechcraft and Hawker types. Aircraft in heavy maintenance are a recurring presence, and fleet-care visits are often timed to coincide with scheduled inspections so that exterior work, cabin refresh and technical sign-off happen in one visit. The airport also lists Finest Care GmbH, an on-site interior specialist at Flughafenstrasse 2, as the cleaning contact for business aviation; our detailing crew coordinates directly with them when cabin work overlaps with upholstery or carpet specialist tasks.

How does a twelve-month program differ from calling in a detailer each time?

A fleet program replaces the call-each-time model with a standing service calendar. At the start of the contract your operations team and our crew build a twelve-month plan: quick exterior rinses or dry washes after every third rotation, full cabin deep-clean monthly, two-stage exterior wash and single-stage polish each spring and autumn, brightwork correction twice a year, gear-bay degreasing before winter. The calendar lives in a shared document; your dispatcher updates aircraft movements, we adjust crew allocation, and every visit generates a dated service sheet with photographs that go into a digital folder for your tech log or SMS.

The operational difference is priority and predictability. Fleet aircraft jump the queue for AOG requests—if your based G280 returns with a bird strike on the nose cone and you need a same-day touch-up before the next charter leg, the program contact pulls a technician from the roster without the usual lead-time negotiation. The financial difference is a fixed monthly invoice per tail number that covers the agreed service mix, so your finance team budgets appearance as a line item rather than chasing ad-hoc approvals every time a captain requests a cabin refresh.

One-off detailing still makes sense for transient aircraft or annual deep corrections, but for any tail that overnights at Augsburg more than twice a month, the program model smooths both the logistics and the cost curve.

What does the service calendar actually contain?

The calendar is a rolling twelve-month grid, built in the first program week and updated monthly. Each tail number gets a column; each row is a service type with its frequency and trigger. A quick turn—rinseless exterior, cabin tidy, glass and galley—might be set to 'after every international leg' or 'weekly if based'. A full cabin deep-clean with seat conditioning, carpet extraction and galley degreasing might recur on the first Sunday of each month when the aircraft is scheduled down. Exterior wash and wax might be locked to April and October, timed to follow or precede scheduled maintenance so the jet leaves the hangar both airworthy and clean.

Brightwork correction, leading-edge paint touch-up and belly degreasing are typically twice-yearly unless you operate in a high-salinity or industrial-pollution environment, in which case the interval shortens. Gear-bay cleaning and nacelle decon are seasonal: before winter to remove summer insect residue and oil staining, before summer to clear salt and de-icing-fluid residue. Each task has an estimated duration and a preferred time-of-day window; our crew and your dispatcher reconcile the calendar against actual flight plans each week, and any change—early departure, delayed maintenance, added charter leg—triggers a quick reschedule by message or call.

The calendar is not a legal document; it is a working tool that keeps both sides aligned without the friction of repeated quoting and rebooking.

How does airside access work for a third-party detailing crew at Augsburg?

Because Augsburg is an airport of entry with customs and border-police presence but no scheduled airline service, airside-pass procedures follow general-aviation norms rather than the tiered-security model of a hub. Our crew holds German airside passes and, where required, temporary escort is arranged through the handling agent or the airport authority. For a fleet program the airport typically issues a standing access approval that covers the contract period, so the same two or three technicians move between apron and hangar without daily re-validation.

The practical rhythm: your aircraft lands, clears if international, taxis to stand; handling agent provides GPU and, if requested, a tow into a hangar slot. Our crew meets the aircraft with equipment pre-positioned—water cart, vacuum, polish kit, towels in a roller case—and begins work as soon as the captain signs the handover and leaves the apron. If the job is a quick turn and the aircraft will depart the same day, we coordinate directly with your dispatcher on the ready-time; if it is an overnight interior or a multi-day maintenance visit, the crew locks the aircraft after each shift and returns the key to the handling agent or to your maintenance contact at Augsburg Air Service.

Because there are no complex airline waves, stand congestion is rare, but if a busy weekend coincides with multiple based jets returning, the handling agent will ask for a preferred stand or hangar in advance. The program contact manages that dialogue so your operations team does not field separate requests from airport, handler and detailer.

What does southern German weather do to a business jet over twelve months?

Augsburg sits in the pre-Alpine climate band: cold winters with occasional snow, warm summers with afternoon convection, and enough humidity year-round to keep organic staining active on exterior surfaces. Paint oxidation is moderate—not as aggressive as Mediterranean sun, faster than Scandinavian overcast—so a single-stage polish twice a year holds gloss on most factory finishes. Brightwork tarnishes steadily through autumn and winter as moisture and road-salt aerosol settle on nacelle lips, gear doors and belly panels; a pre-winter and post-winter correction cycle keeps corrosion at bay.

Cabin materials face a different stress profile. Aircraft based here often work a mix of short European hops and longer intercontinental legs, so cabins accumulate both passenger wear and the dust and pollen that blow across the apron during summer ground stops. Monthly deep-cleans with extraction and conditioning prevent the gradual dulling of leather and the matting of carpet that turn a three-year interior into a ten-year look. Galley and lavatory surfaces benefit from regular degreasing because catering and waste service in a business-aviation environment sometimes skip the no-touch discipline of airline ground ops.

Winter operations bring the usual pitot-cover and static-port discipline, plus the need to clear Type I residue from belly and gear bays before it hardens. The fleet-care calendar builds those tasks into the pre-winter and post-winter service blocks so they happen without a separate call-out.

Who approves changes to the calendar mid-contract, and how quickly?

The program assigns one contact on each side: your operations manager, chief pilot or flight-department administrator on yours, one of our scheduling coordinators on ours. That pair owns the calendar. If your G650 picks up an unscheduled charter leg and the planned Thursday interior must move to Saturday, your contact messages ours; if our crew identifies leading-edge chips during a quick turn and recommends an unscheduled touch-up, our contact calls yours. Approval is a conversation, not a ticket queue, and most changes close within an hour during the daytime operating window.

AOG requests—bird strike, lavatory-seal leak staining the belly, cabin spill before a client leg—go to a separate 24/7 mobile number monitored by the program contact and two backup technicians. If the request arrives during Augsburg's published hours and the aircraft is on the apron, response time is typically under two hours; if it arrives outside curfew or on a Sunday, we coordinate the chargeable PPR with the airport, and the crew is on-site as soon as the field opens or the PPR slot begins.

The twelve-month contract is reviewed quarterly in a thirty-minute call with your operations team: we compare planned versus actual service counts, adjust frequencies if usage patterns have changed, and shift budget between exterior and interior if one is over-tracking. The contract renews automatically unless either side gives sixty days' notice, so most fleet programs run for several years with only minor annual adjustments to scope or pricing.

Questions operators ask about Fleet Care Program at Augsburg

Can the program cover multiple tail numbers in one contract?

Yes; each tail gets its own service calendar and monthly line item, all under one master agreement. A single fleet-care contract can cover two, five or ten aircraft, each with its own service calendar and fixed monthly budget. The master agreement sets the commercial terms and the program contact; individual tail numbers are added or removed by amendment with thirty days' notice, so the contract flexes as your fleet changes.

What happens if an aircraft is away from Augsburg for weeks at a time?

The calendar pauses for that tail; you pay only for services actually delivered, and the schedule resumes when the aircraft returns. If a fleet jet deploys to another base or enters long-term maintenance elsewhere, its calendar is paused and no monthly charge accrues until it returns to Augsburg. Services missed during the away period—monthly interior, seasonal exterior—are rescheduled into the following months without penalty, so the contract remains intact even if utilisation is uneven.

Does the program include consumables like wax, polish compound and cabin-conditioning products?

Yes; all materials, water, chemicals and consumables are included in the fixed monthly budget. The monthly fee covers labour, materials, equipment, water and waste disposal. You do not receive separate invoices for wax, compound, microfibre towels, carpet shampoo or leather conditioner; the only variable charges are for out-of-scope requests—such as an unscheduled paint touch-up requiring colour-match or an expedited PPR fee imposed by the airport for an after-hours AOG.

Can we add an unscheduled service mid-month without renegotiating the contract?

Yes; AOG and urgent requests are covered under the program's priority-access terms, added to the next monthly invoice at the agreed rate. The program includes 24/7 AOG cover, so if you need an unscheduled cabin refresh, an emergency exterior wash after a bird strike, or a rapid gear-bay cleaning before a pre-purchase inspection, you call the program contact and the crew is dispatched. The service is invoiced at the contract's standing rate—no surge pricing—and appears as a line item on the next monthly statement.

Who coordinates with Augsburg Air Service if our aircraft is in maintenance and needs detailing before release?

The program contact coordinates directly with your maintenance provider to align detailing with the release schedule. Because Augsburg Air Service operates a business-jet maintenance base on the field, many fleet-care visits coincide with scheduled inspections. Our program contact liaises with your maintenance manager or the shop foreman to confirm when the aircraft will be out of heavy maintenance, then schedules exterior wash, interior deep-clean and brightwork correction so the jet is both airworthy and presentation-ready at sign-off.

Is hangar space guaranteed for interior work or winter washing?

No; hangar slots at Augsburg are sporadic, so indoor work is requested case-by-case and confirmed by the airport or the handling agent. Augsburg has heated and unheated hangars for business jets up to 6.50 metres tall and 25 metres long, plus a newer hangar completed in 2014, but free slots are only occasionally available. For services that require indoor space—cabin deep-clean in freezing weather, interior during rain—the program contact requests a hangar through the airport or your maintenance provider and confirms availability before scheduling the visit.

Can the program cover de-icing or holdover-time coordination?

No; de-icing and Type I/IV application remain with the handling agent or your flight crew, not the detailing program. The fleet-care program covers appearance—washing, polishing, cabin cleaning, brightwork—but does not include operational de-icing or the application of Type I or Type IV fluids, which are provided by the handling agent or your flight crew under ops-manual procedures. The detailing crew will clear residual de-icing fluid from belly panels and gear bays during post-winter service blocks, but real-time holdover-time calculation and fluid spraying remain outside the scope.

What documentation does the program provide for SMS or tech-log compliance?

Each visit generates a dated service sheet with task list, materials used, and photographs, delivered digitally within 24 hours. After every service—quick turn, monthly interior, seasonal exterior—the crew completes a digital service sheet listing the tasks performed, products applied, and any defects or staining noted. Before-and-after photographs are attached, and the package is emailed to your program contact and, if requested, directly to your SMS coordinator or tech-log custodian within 24 hours of the visit.

How much lead time is needed to start a fleet-care program at Augsburg?

Two to three weeks from contract signature to first service: time for airside-pass coordination, calendar build and crew briefing. Once the contract is signed, the program contact schedules a kick-off call with your operations team to build the twelve-month calendar, gather aircraft details (paint type, cabin materials, OEM finish specs), and confirm preferred service windows. Airside-pass formalities and airport standing-access approval take one to two weeks. First service typically occurs in week three, with the full calendar active by the end of the first month.

Can the program pause for summer or winter if the fleet relocates seasonally?

Yes; the contract can be structured with active and dormant periods if your fleet follows a predictable seasonal pattern. If your operation is seasonal—aircraft based at Augsburg in winter for Alpine access, relocated to the Mediterranean in summer—the contract can be written with active and dormant phases. During dormant months you pay a reduced retainer to hold crew allocation and priority access; during active months the full calendar and monthly budget resume. This structure works for charter operators and corporate flight departments with known seasonal deployment patterns.

Other services at Augsburg