Complete Detail at Augsburg (EDMA)
Exterior decontamination, polish, brightwork and full cabin detail at a Bavarian business-aviation field.
Complete Detail at Augsburg (EDMA) is the reference standard for flight departments preparing a super-midsize or heavy jet for sale, pre-buy inspection or seasonal handover. Over two to five days—usually in the hangar—the aircraft receives paint decontamination and single-stage polish, brightwork restoration, full interior detail and disinfection, and a photographic report documenting condition before and after. Augsburg is a daytime-only general-aviation airport seven kilometres north-east of the city centre, equipped for customs clearance and home to a business-jet maintenance base; the rhythm is business aviation rather than airline waves, and the field's published hours and hangar availability shape how a multi-day detail is scheduled.
07/25 · 1594 m
AIP and airport data1515 ft
Mon-Sat 07:00-21:00 local, Sun/public holidays 09:00-21:00 local (AC-U-KWIK: M-Sa 0600-2000Z, Su 0800-2000Z, otherwise PPR)
Airport is not open 24 h: movements before 07:00 (Mon-Sat), before 09:00 (Sun/holidays) or after 21:00 (daily) only with chargeable PPR7 km
Augsburg city centre (north-east of the city; Wikipedia 7 km, AC-U-KWIK 7 km, Universal 6.6 km)What changes at Augsburg?
Augsburg sits at 1515 feet elevation with a single 1594-metre runway; traffic is almost entirely general and business aviation with no scheduled airline service, so ramp access and turnaround timing follow business-aviation rhythms rather than airline waves. The airport operates Monday to Saturday 07:00 to 21:00 local, Sunday and public holidays 09:00 to 21:00; movements outside those hours require a chargeable prior-permission request, which means any evening or early-morning detailing slot must be arranged with the airport in advance. Customs and border police are on site, so international jets can clear directly at Augsburg.
Hangar space exists—airport hangars of 75 by 25 metres and 75 by 20 metres accommodate aircraft up to 6.50 metres tall and 25 metres long, heated and unheated, and a business-aviation hangar was added in 2014—but free slots are only sporadically available, so indoor washing and detailing space cannot be assumed. Augsburg Air Service, part of the Atlas Air Service group, runs a business-jet maintenance base on the field with several hangars servicing Embraer, Citation, Beechcraft and Hawker types; aircraft in maintenance are a recurring presence, and coordination with the maintenance schedule often determines when a complete detail can begin.
Why does a complete detail take two to five days?
Paint decontamination removes bonded contamination—industrial fallout, tree sap, insect protein, exhaust residue—that a rinseless or dry wash leaves behind; the process is clay-bar work across every painted surface, followed by single-stage machine polish to restore gloss and fill minor marring. Brightwork on nacelle lips, leading edges and gear components is polished separately. Inside, every cabin surface is cleaned to OEM material specifications, galley and lavatory are disinfected, carpets and soft goods are extracted, and the flight deck receives a no-touch avionics clean. The photographic report captures the state of the aircraft before work begins and again after completion, creating a visual record for the tech log, the buyer or the pre-buy inspector.
Weather, hangar availability and the size of the aircraft all influence duration: a super-midsize jet with light contamination may be finished in two days if a hangar slot opens immediately, while an ultra-long-range aircraft arriving after a transatlantic crossing in winter, with exhaust staining on the belly and salt on the gear bays, will need four or five days. The work is scheduled as a continuous block rather than split across weeks, so the aircraft is returned to service in one movement.
What does the Bavarian climate do to the aircraft between details?
Augsburg's continental climate brings cold winters, warm summers and year-round humidity; freezing temperatures from November through March mean that aircraft parked overnight or cold-soaked after descent accumulate frost on wings and empennage, and any moisture trapped in panel gaps or around static ports can freeze. De-icing with Type I fluid is routine in winter, and residue from glycol-based fluids attracts dust and forms a sticky film on the belly and lower fuselage if not removed promptly. Spring and autumn bring rain, and standing water on the ramp carries particulate that dries as spotting on the fuselage and brightwork.
Inside, tracked-in moisture, de-icing salt from aprons and road grit from ground crew boots all accumulate in the cabin during the heating season; carpets in the entry area and galley show the evidence first. Summer heat raises cabin humidity when the aircraft sits on stand with the door open, and any organic material left in the galley or lavatory will begin to smell within hours. A complete detail twice a year—once before the summer season, once before winter—keeps paint, brightwork and cabin materials ahead of the cycle, and the photographic report provides a baseline for the next interval.
How does the photographic report work before a sale or pre-buy?
The report is shot in two passes: before any work begins, documenting the condition as delivered, and after completion, showing the result. Each pass covers the exterior in sections—port and starboard fuselage, upper surfaces, belly, nacelles, winglets, tail, gear bays, brightwork—and the interior by zone: flight deck, forward cabin, galley, lavatory, aft cabin, baggage compartment. Close-up frames capture areas of concern: paint chips on leading edges, corrosion on brightwork, staining on cabin sidewalls, wear on seat leather. The images are date-stamped, captioned by location, and delivered as a digital file with the tech-log entry.
For a pre-buy inspection, the report gives the surveyor a visual record of appearance condition independent of the logbook narrative; for a sale, it demonstrates to the buyer that the aircraft was professionally presented and documented. The before-and-after sequence also protects the seller by showing exactly what work was done and what condition existed underneath, which matters if a buyer later raises a claim about pre-existing damage. The file is yours; we keep no copies once it is handed over.
What does the handler expect from a third-party detailing crew at Augsburg?
The airport names an on-site interior specialist, Finest Care GmbH, for aircraft interior cleaning and upholstery, and handling agents present at the airport are accustomed to third-party service providers working on the ramp or in the hangars. Expectations are straightforward: current airside passes for every technician, liability insurance naming the airport, and a method statement if any chemical product will be used on the apron. If the detail will take place in a hangar, the handler needs advance notice to coordinate the slot with the airport and, if applicable, with Augsburg Air Service, which manages several hangars on the field.
Water use on the apron is subject to the airport's environmental rules; if a rinse is required after decontamination, it must be contained or conducted in a wash bay, and the handler will specify the location. Waste—used clay bars, polish residue, interior extraction water—is collected in sealed containers and disposed of according to the airport's waste-handling protocol. The handler will ask for an estimated finish time each day so that ground power, towing and any security escort can be scheduled; if the work runs past the airport's published hours, the chargeable PPR must already be in place or the aircraft will remain on stand until the field reopens the next morning.
When should a complete detail be scheduled at Augsburg?
The service is recommended once or twice a year: before the summer season, when the aircraft will be seen by charter clients or partners, and again in late autumn before winter operations begin. It is also the standard preparation before a pre-buy inspection, a delivery to a new owner, or any event where the aircraft's appearance will be scrutinised. Lead time depends on hangar availability; if a slot is already reserved for scheduled maintenance at Augsburg Air Service, the detail can often be added to that window with a week's notice. If no maintenance is planned, request the detail three to four weeks in advance so that hangar space and airside access can be arranged.
Avoid scheduling a complete detail immediately before a long positioning flight in winter or a transatlantic crossing in poor weather; freshly polished paint and brightwork will be covered in exhaust residue, glycol and salt within hours, and the cabin will be tracked through again by crew and passengers. The best result comes when the detail is the final preparation before the aircraft enters service or is presented for inspection, with no intermediate flight longer than an hour or two.
Questions operators ask about Complete Detail at Augsburg
How long does a complete detail take at Augsburg?
Two to five days, depending on aircraft size, contamination level and hangar availability. A super-midsize jet with light contamination may be finished in two days if a hangar slot is immediately available, while an ultra-long-range aircraft with heavy exhaust staining, salt on the gear and a full cabin will need four or five days. The work is scheduled as a continuous block rather than split across weeks.
Can a complete detail be done on the apron at Augsburg, or does it require a hangar?
Hangar space is preferred and usually necessary, but free slots are only sporadically available. The airport has heated and unheated hangars accommodating aircraft up to 6.50 metres tall and 25 metres long, and a business-aviation hangar was added in 2014, but free slots depend on maintenance schedules at Augsburg Air Service. If no hangar is available, some exterior work can be done on the apron under dry conditions, but interior detail and paint polish are best conducted indoors.
What is included in the photographic report?
Date-stamped images of the aircraft before and after the detail, covering exterior, interior and close-ups of any areas of concern. The report documents condition as delivered and again after completion, with frames of the fuselage, wings, belly, nacelles, tail, gear, brightwork, flight deck, cabin zones, galley, lavatory and baggage compartment. Close-ups capture paint chips, corrosion, staining or wear. The file is delivered digitally with the tech-log entry and is yours to keep.
Does Augsburg allow water use on the apron for decontamination rinse?
Water use is subject to the airport's environmental rules and must be contained or conducted in a designated wash bay. If a rinse is required after clay-bar decontamination, the handler will specify the location and containment method. Most complete details are conducted in the hangar, where water use is controlled, but if apron work is necessary, the airport's waste-handling protocol applies and all runoff must be collected.
Can the detail be scheduled outside Augsburg's published operating hours?
Only with a chargeable prior-permission request arranged in advance through the airport. The airport operates Monday to Saturday 07:00 to 21:00 local, Sunday and public holidays 09:00 to 21:00; movements outside those hours require a chargeable PPR. If the detail will run into the evening or start early, the PPR must be in place before the aircraft arrives, or it will remain on stand until the field reopens.
What does paint decontamination remove that a dry wash does not?
Bonded contamination: industrial fallout, tree sap, insect protein, exhaust residue and embedded particulate. A dry wash or rinseless wash removes loose dirt and light soiling, but bonded contamination remains on the paint surface. Decontamination uses clay-bar work across every panel to lift embedded material, followed by single-stage machine polish to restore gloss and fill minor marring. The result is a smooth, reflective finish that sheds water and resists new contamination.
Is disinfection included in the interior detail?
Yes, cabin and flight-deck disinfection is part of the complete detail. After all surfaces are cleaned, high-touch areas—armrests, seat controls, galley handles, lavatory fixtures, flight-deck switches and yoke—are disinfected with an aviation-approved product. Soft goods are extracted, and any organic material is removed from the galley and lavatory to prevent odour.
How much advance notice is needed to schedule a complete detail at Augsburg?
Three to four weeks if no maintenance is planned; one week if a hangar slot is already reserved. Hangar availability is the limiting factor. If the aircraft is already scheduled for maintenance at Augsburg Air Service, the detail can often be added to that window with a week's notice. If no maintenance is planned, request the detail three to four weeks in advance so that hangar space, airside access and any PPR can be arranged.
What happens if the detail overruns the estimated finish time?
The handler needs updated timing for ground power, towing and security escort; if the airport's hours are exceeded, a PPR must already be in place. If the work will run past 21:00 (or 09:00 on Sundays), a chargeable prior-permission request must have been arranged before the detail began, or the aircraft will remain on stand until the field reopens. The handler will ask for an estimated finish time each day so that support services can be scheduled.
Why is a complete detail recommended before a pre-buy inspection or sale?
It presents the aircraft in reference condition and provides a documented baseline of appearance for the surveyor or buyer. A pre-buy surveyor assesses condition as presented; a complete detail ensures that paint, brightwork and cabin materials are shown at their best, and the photographic report gives the surveyor a visual record independent of the logbook. For a sale, it demonstrates professional presentation and protects the seller by documenting exactly what condition existed before handover.