Brightwork Polish at Augsburg (EDMA)
Mirror-finish brightwork restoration on the Augsburg ramp, timed between legs and documented for your tech log.
Brightwork Polish at Augsburg (EDMA) is a hand-polishing service for chief pilots and flight departments operating super-midsize to ultra-long-range business jets through this general-aviation-focused airport seven kilometres north-east of Augsburg city centre. We restore bare-metal leading edges, engine inlets, spinners, exhausts, window surrounds and bright trim to a mirror finish, then seal the surface to slow oxidation. Work is performed on the apron, coordinated with the handling agent and documented with a photo report for your records. The service takes one to three days depending on the extent of bare metal and is typically scheduled two to four times a year or as part of a complete detail.
07/25 · 1594 m
AIP and airport data1515 ft
Mon-Sat 07:00-21:00 local, Sun/public holidays 09:00-21:00 local (AC-U-KWIK: M-Sa 0600-2000Z, Su 0800-2000Z, otherwise PPR)
Airport is not open 24 h: movements before 07:00 (Mon-Sat), before 09:00 (Sun/holidays) or after 21:00 (daily) only with chargeable PPR7 km
Augsburg city centre (north-east of the city; Wikipedia 7 km, AC-U-KWIK 7 km, Universal 6.6 km)What changes at Augsburg?
Augsburg sits at 1515 feet elevation with a single 1594-metre runway (07/25) and operates as a daytime-only field: published hours are 07:00 to 21:00 Monday through Saturday, 09:00 to 21:00 on Sundays and public holidays. Anything outside that window requires a chargeable prior-permission request, so if you need an early departure or an evening arrival to create a brightwork slot, we arrange that PPR with the airport in advance. Traffic here is almost entirely general and business aviation—no scheduled airline waves—which means ramp access and turnaround timing follow business-aviation rhythms, not airline slots.
Customs and border police are on site, so international jets clear directly at Augsburg. Hangar space exists (the airport lists hangars of 75 by 25 metres and 75 by 20 metres, heated and unheated, for aircraft up to 6.50 metres tall and 25 metres long, plus a newer business-aviation hangar from 2014), but free slots are only sporadically available; we cannot assume indoor space and plan most brightwork polishing outdoors on the stand. Augsburg Air Service runs a business-jet maintenance base on the field—Embraer, Citation, Beechcraft, Hawker—so aircraft in for maintenance are a recurring presence, and coordination with the handling agent is routine.
Why does brightwork oxidise faster in southern Germany?
Augsburg's continental climate brings warm summers, cold winters and a fair amount of precipitation year-round. Rain and morning dew settle on horizontal and near-horizontal surfaces—leading edges, inlet rings, the top of nacelles—and if the aircraft sits on the ramp for a few days, that moisture starts the oxidation cycle on bare aluminium or magnesium. Winter brings road salt and de-icing chemicals into the air; summer brings industrial particulate from the Munich metropolitan area to the south-east. Both accelerate corrosion on polished metal.
Brightwork that looks mirror-bright in October will show a haze by January if the aircraft spends time on European ramps. We see it most on inlet rings and leading edges: the surface loses its sharpness, reflections turn milky, and in advanced cases you get white or grey powder in the grain of the metal. A single-stage hand polish removes the oxidation, restores the mirror finish and resets the clock. The sealant we apply afterwards—a hydrophobic polymer—slows the next cycle by shedding water and reducing direct metal-to-air contact, but it is not permanent; two to four services a year keep the brightwork looking as it did at delivery.
How do you coordinate brightwork work with the handling agent at Augsburg?
We are an independent third-party crew, not part of the handling agent's staff, so every job begins with a three-way conversation: your flight department, the handler and our team. The handler confirms the stand, the expected arrival and departure times, any GPU or ground-service requirements, and whether the aircraft will remain under their watch overnight. We then schedule the polish around those fixed points.
Brightwork polishing is a multi-day service—one to three days depending on the amount of bare metal—so we typically start after your passengers disembark and the aircraft is released from the handler's immediate turnaround. If the jet is staying for maintenance at Augsburg Air Service or simply parked for a few days, we have more flexibility. If it is a quick turn, we may polish only the most visible surfaces (inlet rings, windscreen surrounds) and schedule the full leading-edge work for the next longer stop. The handler expects us to stay clear of pitot probes, static ports, avionics bays and any panel the maintenance crew has flagged; we note those no-touch zones in our pre-work walk-around and photograph them for the record.
What does a brightwork polish include on a super-midsize jet?
We begin with a close inspection of every bare-metal surface: wing and horizontal-stabiliser leading edges, engine inlet rings, spinners (if exposed), exhaust and thrust-reverser petals, window surrounds, cheat-line trim and any other bright metal the OEM left unpainted. We photograph the before state, noting any deep pitting, corrosion or paint overspray that will need extra attention.
The polish itself is done by hand using a graduated sequence of compounds—coarse enough to cut through oxidation, fine enough to leave a mirror finish without new scratches. Inlet rings and spinners get particular care because they are eye-level and any swirl marks show in direct sunlight. Leading edges are worked in sections, each buffed until reflections are sharp and the metal feels glassy under a clean cloth. Exhaust surfaces—often discoloured by heat and combustion residue—are polished as far as the metal's temper allows; we cannot always restore a perfect mirror on exhaust petals, but we remove the carbon staining and bring back as much brightness as the alloy will hold.
Once the metal is polished, we apply a sealant: a hydrophobic polymer that beads water and slows oxidation. The sealant cures in an hour and adds perhaps two months to the interval before the next haze appears. We finish with a final wipe-down, a second set of photographs and a written note of any areas—paint chips along a leading edge, a cracked spinner dome—that may need paint-shop or maintenance attention. That report goes into your tech log or flight-department file.
Can brightwork be polished in winter at Augsburg?
Yes, though ambient temperature and daylight hours shape the schedule. Our compounds and sealants work down to about three degrees Celsius; below that the sealant will not cure properly and the polish becomes harder to control. Augsburg's winter days are short and the airport's daytime-only hours mean we lose working light by mid-afternoon in December and January. If the aircraft is parked outdoors and the forecast shows overnight frost, we may need to pause work until the metal warms above freezing; polishing cold-soaked aluminium risks trapping condensation under the sealant.
Hangar space would solve all of that, but as noted free hangar slots at Augsburg are sporadic. When a heated hangar is available we can work around the clock and deliver the aircraft in two long shifts instead of three short days. When it is not, we simply build in weather contingency: if the forecast shows a string of clear days above five degrees, we proceed on the ramp; if it shows freezing rain or heavy snow, we propose a delay or move the appointment to a warmer month. Winter brightwork is entirely feasible here—we have done it many times—but it requires more planning than a July polish.
How does Terso document the work for the tech log?
Every brightwork service ends with a written report and a set of before-and-after photographs. The report lists the surfaces polished, the compounds and sealant used, the ambient conditions (temperature, humidity, whether the work was indoors or outdoors) and any findings—corrosion, paint damage, loose fasteners—that we noted during the inspection. The photographs are date-stamped and organised by zone: left wing leading edge, right inlet, nose windscreen surrounds, and so on. If you need the images in a particular format or resolution for your maintenance-tracking software, tell us in advance and we will match it.
The package is delivered as a PDF by email within twenty-four hours of completion, and we keep a copy in our own records for three years. Some flight departments file it in the tech log under "cosmetic maintenance"; others keep it in a separate appearance-history folder. Either way, the documentation provides a dated record that the brightwork was inspected, polished and sealed, which is useful both for resale value and for tracking the interval to the next service. If an auditor or pre-purchase inspector asks when the leading edges were last polished, you will have a timestamped answer with photographs.
Questions operators ask about Brightwork Polish at Augsburg
How long does brightwork polishing take at Augsburg?
One to three days, depending on the amount of bare metal and the degree of oxidation. A typical super-midsize jet with inlet rings, leading edges and window surrounds takes two full days. An ultra-long-range aircraft with extensive brightwork—spinners, exhaust petals, cheat-line trim—may need three. We can compress the schedule if a heated hangar is available, but outdoor work follows daylight and temperature.
Can you polish brightwork while the aircraft is in maintenance at Augsburg Air Service?
Yes, and it is often the ideal time because the jet is already on the ground for days. We coordinate with the maintenance team to ensure our work does not interfere with panel access, engine runs or rigging checks. Polishing is scheduled around their tasks, and we stay clear of any area they have flagged. The result is that the aircraft leaves maintenance with both airworthy systems and mirror-bright metal.
What if the brightwork is heavily oxidised or pitted?
We can remove oxidation and restore the polish; deep pitting may remain visible but will be clean and sealed. Heavy oxidation requires more aggressive compounds and more passes, but the mirror finish is recoverable. Deep pits—actual voids in the metal—cannot be polished away without removing too much material; we clean them, polish around them and note them in the report. If corrosion is active, we recommend a maintenance inspection before sealing.
Do you need the aircraft on GPU, or can you work with batteries off?
We do not need electrical power; brightwork polishing is entirely external and manual. The aircraft can be dark and unpowered. We do ask that the handler keep the jet on chocks and that no engine runs or towing happen while we are working on the leading edges or inlets. If maintenance needs to power up the aircraft, we step back until it is safe to resume.
Is brightwork polishing allowed during Augsburg's curfew hours?
No, unless you arrange a chargeable PPR with the airport for access outside 07:00–21:00. The airport is not open twenty-four hours; movements and ramp work before 07:00 (09:00 on Sundays and holidays) or after 21:00 require prior permission and incur a fee. If your schedule demands an early start or late finish, we coordinate the PPR request, but most brightwork appointments fit comfortably within daytime hours.
What happens if it rains during the polishing?
We pause work, cover the aircraft and resume when the metal is dry. Polishing wet metal spreads contamination and prevents the sealant from bonding. If rain arrives mid-job, we towel off the work area, cover it with clean sheeting and wait for the surface to dry. Light drizzle may add a few hours; heavy rain may push the schedule to the next day. Weather contingency is built into our planning.
Can you polish only the inlet rings and skip the leading edges?
Yes; we can tailor the service to your priorities and your schedule. Some operators prefer to keep the most visible brightwork—inlet rings, windscreen surrounds—mirror-bright and accept a slower cycle on the leading edges. We price and schedule each zone separately, so you choose what gets polished and when. A partial brightwork service typically takes one day instead of two or three.
How often should brightwork be polished on a jet based in Germany?
Two to four times a year, depending on how much time the aircraft spends outdoors. A jet that lives in a hangar and flies weekly can go four to six months between polishes. One that sits on the ramp in all weather will show oxidation in six to eight weeks. Most flight departments schedule brightwork in spring and autumn, with an extra service in winter if de-icing chemicals have been heavy.
Do you bring your own water and power, or does the handler provide them?
Brightwork polishing uses only compounds, cloths and sealant—no water, no power. The service is entirely manual and dry. We carry our own supplies, waste bags and lighting if we are working into the evening. The handler provides nothing except the stand and confirmation that the aircraft is released for third-party work.
Is a photo report included, or is it an extra?
Included; every brightwork service ends with before-and-after photographs and a written summary. The report is delivered as a PDF within twenty-four hours and covers all polished surfaces, the products used and any findings that may need maintenance attention. There is no additional charge; documentation is part of the service and goes into your tech log or appearance file.