Exterior Dry Wash at Stuttgart (EDDS)
Rampside waterless detailing at the General Aviation Terminal—scheduled inside your slot window.
Exterior Dry Wash at Stuttgart suits flight departments managing short turnarounds at a coordinated airport where every minute counts. We clean super-midsize through ultra-long-range jets on the GA apron using rinseless chemistry—no wash bay, no runoff, no delay to your next leg. The work fits between a morning arrival and an afternoon departure, or overnight when the aircraft cold-soaks on stand. Kurz Aviation coordinates apron access; we arrive airside with our own kit, document the job in photos, and leave the airframe ready for the next sector.
07/25 · 3345 m
AIP and airport data1276 ft
Airport H24 with night restrictions (AC-U-KWIK: H24 restricted; Kurz Aviation: 24/7 depending on aircraft type); jet departures 06:00-23:00 and arrivals 06:00-23:30 local; General Aviation Terminal staffed 05:30-23:00 (Sat/Sun until 22:30)
Night-flight restrictions 23:00-06:00: no take-offs after 23:00; no civil jet landings 23:30-06:00 (delayed landings until 24:00 only if scheduled before 23:30); exceptions for approved delayed flights, propeller aircraft and night mail within noise limits, with a night surcharge on the noise charge13 km
Stuttgart city centre (south of the city)1 on the airport
independent, no affiliationDedicated General Aviation Terminal (GAT) at Flughafenstrasse 116, a separate passenger building away from the regular terminals, opened in 1998; handling there is run by Kurz Aviation Service, with two hangars
Why choose a dry wash at Stuttgart instead of waiting for a wet facility?
Stuttgart is a Level 3 slot-coordinated airport, so your departure window is fixed the moment the slot is confirmed. Waiting for a wash bay—especially during Messe Stuttgart trade-fair weeks when parking is tight—can push you into the next available slot or force an expensive re-coordination. A dry wash happens on stand: we bring waterless detailing chemistry, microfibre and polish straight to the aircraft, work around GPU and catering trucks, and finish while the cabin crew restocks.
Rinseless products lift bug strikes, exhaust soot and hydraulic mist without high-pressure water, so there is no need to tow the jet to a remote wash pad or negotiate environmental approvals. For operators flying a weekly Stuttgart–Geneva–London rotation, a dry wash every second visit keeps the airframe presentable without the logistical weight of a full decon and rinse. The process also suits one-off cleans: an inbound red-eye lands at 06:30, we start at 07:00, and the aircraft is polished and photo-documented by early afternoon, ready for the owner's evening departure.
What changes at Stuttgart that affects the timing of exterior cleaning?
The airport sits at 1,276 feet elevation, thirteen kilometres south of Stuttgart city centre, with a single runway—07/25, 3,345 metres—and a night curfew that shapes the working day. Jet departures are permitted 06:00–23:00 and arrivals 06:00–23:30 local time; no take-offs after 23:00, and no civil jet landings between 23:30 and 06:00 except delayed flights originally scheduled before 23:30, which may land until midnight. The General Aviation Terminal at Flughafenstrasse 116 is staffed 05:30–23:00 (weekends until 22:30), so any late-evening detailing must be arranged in advance with the handler and our crew.
Because every movement requires a slot, turnaround windows are fixed: if you have a two-hour slot and catering runs late, the dry wash compresses into whatever time remains. Messe Stuttgart—the state trade-fair complex—sits directly beside the airport and generates business-aviation peaks during major fairs; parking becomes scarce, handlers prioritise quick turns, and our pre-positioning on the apron the night before ensures we start the moment the chocks go in. Kurz Aviation Service manages GA handling and controls apron access, so we coordinate entry, equipment and waste disposal through them. Customs and immigration are available twenty-four hours at the GAT, which matters for early inbounds: an 06:15 arrival clears in thirty minutes, and we can begin work by 07:00 without waiting for office hours.
How does a dry wash work on a super-midsize or larger jet at the GAT?
We start at the nose: spray a panel with waterless detailing solution, let it dwell fifteen seconds to emulsify contaminants, then wipe with a clean microfibre in straight, overlapping passes. Bug strikes on the radome and leading edges get a second application and a soft brush if the residue is baked on. The process moves aft along the fuselage—one panel at a time—then out to the winglets, across the horizontal stabiliser and down the nacelles. Exhaust soot around the tailpipe and APU outlet needs a heavier concentration and a dedicated grey towel; we never cross-contaminate a sooty towel onto painted surfaces.
Belly work and landing-gear degreasing happen with the aircraft on its own gear or, if the handler offers a tow into Hangar 1, under LED work lights. We spray a biodegradable degreaser onto the belly skin and gear struts, agitate with a brush, then wipe and buff. Exterior windows—cockpit, cabin, baggage-door glass—are cleaned with an ammonia-free glass polish to avoid streaks in low-angle sunlight. Leading-edge brightwork gets a light polish if oxidation is starting; a full brightwork restoration is a separate line item, but we include touch-up buffing in the standard dry wash. The final step is a walk-around with the captain or handling agent: we note any paint chips, corrosion spots or fluid leaks in the tech log and photograph the finished airframe in six standard angles for the flight department's records.
What do Stuttgart handlers expect from a third-party detailing crew on the apron?
Kurz Aviation Service requires every contractor to hold a valid airside pass or be escorted at all times. We carry Flughafenkoordination Deutschland-compliant insurance and submit our crew list and vehicle registration forty-eight hours before the job; the handler emails an apron-access confirmation and assigns a parking spot for our van near the GAT. On the day, we check in at the handler's operations desk, collect the escort if needed, and move equipment to the stand only after the aircraft has been chocked and the GPU connected.
The handler expects us to keep the work area clean: all waste—used towels, empty product bottles, packaging—goes into our own bins and leaves with us. If we need potable water for a final rinse of the windscreen or to dilute a degreaser, we ask the handler in advance; we do not tap into aircraft service points. FOD discipline is non-negotiable: microfibre cloths are counted before and after, and any dropped item is reported immediately. When the job is finished, we walk the stand with the handling agent, confirm no fluid has been spilled, and sign off in their contractor log. For recurring cleans—say, a fractional operator with a Wednesday-morning Stuttgart slot every week—the handler keeps our access paperwork on file, and we simply call ops the evening before to reconfirm the stand number and start time.
How does recurring dry-wash scheduling work for a Stuttgart-based jet?
Flight departments running a regular Stuttgart operation—corporate shuttle, fractional share, charter certificate—typically book a dry wash every two to four weeks, depending on utilisation and season. We set a standing appointment: second Tuesday of the month, 08:00 start, four-hour window. The scheduler sends us the tail number and stand assignment by email the afternoon before; if the inbound leg is delayed or the aircraft diverts, we adjust on twenty-four hours' notice at no charge. For aircraft that overnight at Stuttgart between a late arrival and an early departure, we can start work after the cabin crew leaves and finish before the morning pre-flight, provided the handler grants night-apron access and the curfew allows the inbound landing.
Recurring work builds efficiency: we know the airframe, we have notes on problem areas—a belly panel that collects hydraulic mist, a winglet leading edge prone to bug strikes—and we bring exactly the right quantity of product. The handler recognises our van, the security checkpoint waves us through, and the captain trusts the process enough to sign the release remotely. When Messe Stuttgart has a major fair and parking is tight, we ask the handler to reserve our usual stand or accept a different day that week; flexibility on both sides keeps the schedule intact even during peak traffic.
What documentation and photo reporting do you provide after a dry wash at Stuttgart?
Every job closes with a digital report emailed to the flight department within two hours of completion. The report includes six time-stamped photographs—port profile, starboard profile, nose three-quarter, tail three-quarter, belly (if accessible), and cockpit windows—plus a checklist confirming fuselage, wings, empennage, nacelles, gear, windows and lights have been cleaned. If we find paint damage, corrosion, fluid leaks or loose fasteners during the wash, we photograph the defect, mark its location on a plan-view diagram, and note it in a separate 'observations' section; this goes to the captain and, if requested, to the operator's maintenance-control desk.
For fleet operators or management companies tracking multiple tails, we can integrate our reports into your existing maintenance platform—upload photos to a shared folder, populate fields in a CAMO database, or simply forward the PDF to your tech-log coordinator. The documentation satisfies audit trails and helps schedule the next service: if the report shows heavy bug accumulation after a summer Mediterranean leg, the scheduler might move the next dry wash forward by a week. We also keep our own archive: if a dispute arises six months later about a paint chip or a window scratch, we can pull the original photos and prove the condition at handover.
Questions operators ask about Exterior Dry Wash at Stuttgart
How long does an exterior dry wash take on a super-midsize jet at Stuttgart?
Three to five hours for a super-midsize, up to eight hours for an ultra-long-range airframe. A Challenger 350 or Citation Latitude takes three to four hours; a Gulfstream G650 or Global 7500 needs six to eight hours, depending on belly access and the degree of soiling. We give you a firm time estimate when you book, based on the aircraft type and the last wash date.
Can you clean the aircraft overnight between a late arrival and an early departure?
Yes, if the inbound lands before the curfew and the handler approves night-apron access. The GAT is staffed until 23:00 (22:30 weekends), and jet arrivals are permitted until 23:30. If your aircraft lands at 22:00, we can start after the cabin crew finishes and work through the night, finishing by 06:00 for a morning departure. We coordinate night access with Kurz Aviation in advance.
Do you need to tow the aircraft to a wash bay, or can you work on stand?
We work on stand; no wash bay or tow is required. Dry-wash chemistry is rinseless, so we clean the aircraft wherever it is parked on the GA apron. If the handler offers hangar space and you want belly work under cover, we can move inside, but it is not necessary for the standard service.
What happens if the slot changes and the turnaround window shrinks?
We adjust our crew size or reschedule to the next available window at no penalty. Slot changes are common at a coordinated airport. If your two-hour window compresses to ninety minutes, we either add a second technician to finish on time or, if that is not practical, move the wash to the next leg. We do not charge a cancellation fee for slot-driven changes notified more than twelve hours in advance.
Can you remove heavy bug strikes and exhaust staining in a single dry wash?
Yes, with an extra dwell time and a soft brush for baked-on residue. Bug protein and exhaust carbon come off with a second application of the waterless solution and gentle agitation. If the leading edges have months of buildup, we recommend a clay-bar treatment as an add-on, but most residue lifts in the standard wash.
How do you coordinate apron access with Kurz Aviation Service?
We submit crew details and insurance forty-eight hours before; the handler emails an access confirmation. Kurz Aviation requires a crew list, vehicle registration and proof of liability insurance two days ahead. On the morning, we check in at their ops desk, collect an escort if needed, and move to the stand only after the aircraft is chocked and the handler gives clearance.
Do you provide a photo report and maintenance notes after the wash?
Yes—six time-stamped photos and a checklist, emailed within two hours of completion. The report includes port, starboard, nose, tail, belly and cockpit-window images, plus a signed checklist. If we spot paint damage, corrosion or fluid leaks, we photograph the defect and note its location so your maintenance team can follow up.
Can you set up a recurring dry-wash schedule for a Stuttgart-based aircraft?
Yes—we book a standing appointment and adjust on twenty-four hours' notice if the schedule changes. Many operators choose a fixed slot—say, the first Monday of each month at 08:00. We keep your aircraft details on file, coordinate with the handler in advance, and invoice monthly. If a leg is delayed or the aircraft diverts, we reschedule at no charge.
What do you do with waste water and used towels after a dry wash?
There is no waste water; used towels and product bottles leave with us in sealed bins. Rinseless chemistry means zero runoff. All waste—microfibre cloths, empty containers, packaging—goes into our own bins and is disposed of off-airport in compliance with local environmental rules. The handler inspects the stand before we leave to confirm no residue remains.
How does the Messe Stuttgart trade-fair calendar affect dry-wash scheduling?
Fair weeks bring traffic peaks and tighter parking, so we book earlier and stay flexible on stand assignments. When a major fair is running, business-aviation movements spike and apron space fills quickly. We ask the handler to reserve our usual stand or accept a different day that week. Early booking—two weeks ahead instead of two days—helps secure a slot during peak periods.