Call now Book a Service
LSGS · SIR · Sion, Switzerland

Complete Detail at Sion (LSGS)

Multi-day exterior decontamination, polish and full interior disinfection at the Valais valley base

Complete Detail at Sion is a reference-standard service for flight departments delivering or selling an aircraft, or resetting appearance before a season. On the ramp at LSGS—or more often inside one of the hangars—we wash, decontaminate and polish the exterior, restore brightwork, detail and disinfect the cabin and flight deck, and hand over a photographic report. The work takes two to five days and suits super-midsize through ultra-long-range jets; Sion's position as a winter-season gateway to the Valais resorts and its daylight-only schedule make it a natural staging point for operators who want the aircraft immaculate before the charter peak or a pre-buy inspection.

Runway

07/25 · 2000 m, 07/25 GRASS · 660 m

AIP and airport data
Elevation

1582 ft

Operating hours

Aerodrome administration APR-SEP 05:00Z to end of daylight (max 18:00Z), OCT-MAR 07:00Z to end of daylight (max 19:00Z); FBOs staffed 07:00-20:00 local in summer and 08:00 to nightfall in winter

No night operations: the aerodrome closes at the end of daylight (latest 18:00Z summer / 19:00Z winter); flights outside administration hours need special permission (PPR) and services are on request
Distance

2.5 km

Sion city centre
Handling agents

2 on the airport

independent, no affiliation

Why schedule a complete detail at an Alpine airport?

Sion sits at 1,582 feet in the Rhône Valley, flanked by peaks that funnel weather and compress the working day. Operators stage here for Crans-Montana, Zermatt, Verbier and the other Valais resorts, so winter traffic is heavy and the aircraft spend days—sometimes weeks—on cold-soaked ramps while principals ski. That combination of altitude, temperature swing and static exposure leaves paint dull, brightwork tarnished and cabins tracked with salt and grit.

A complete detail reverses twelve months of wear in one visit. We decontaminate the paint to lift embedded contamination, single-stage polish to restore gloss, bring back the nacelle and gear-door brightwork, then move inside for a full strip-and-dress of the cabin and a disinfection pass over every high-touch surface. You leave with an aircraft that photographs well and smells clean—exactly what a pre-buy inspector or a charter client expects. The valley location also means we can coordinate the work between ski-season legs without repositioning the jet to a coastal base.

What changes at Sion?

The aerodrome operates daylight-only: administration hours run 05:00Z to end of daylight—maximum 18:00Z—April through September, and 07:00Z to end of daylight—maximum 19:00Z—October through March. Night operations are prohibited. The two handling agents present at the airport, Signature Flight Support and Alpinejet Handling, staff their terminals 07:00 to 20:00 local in summer and 08:00 to nightfall in winter, so any movement outside those windows needs prior permission and services are on request.

Runway 07/25 is 2,000 metres of asphalt; a 660-metre grass strip runs parallel but is irrelevant to business jets. Hangar space is plentiful: the airport lists capacity for aircraft up to 77,000 kilograms, Signature operates a 67,200-square-foot hangar, and Alpinejet offers storage. We prefer to detail inside when the forecast calls for snow or the cold soak threatens to freeze rinseless product on the fuselage. Customs and immigration are on site during administration hours; airside ramp access is controlled and requires an airport ID card backed by a police record extract, so we maintain standing credentials.

The winter ski season compresses every timeline. FBO hours shorten, daylight ends early, and the apron fills with transient aircraft. If you want a complete detail in January or February, book the slot and the hangar space together at least two weeks ahead; in summer the pressure eases and we can often start within three days of the request.

How long does a complete detail take at Sion?

Two to five days, depending on the size of the aircraft, the condition of the paint and whether we work inside or on the ramp. A super-midsize jet with reasonably maintained paint will occupy us for two full days; an ultra-long-range airframe that has spent a season shuttling between Sion and the North Sea without a proper wash can stretch to five. The decontamination pass—clay bar or chemical decon, depending on what the paint tells us—takes the longest, because we will not move to the polish stage until every panel is clean at the microscopic level.

We start with the exterior: dry wash, decon, single-stage polish, brightwork restoration. Once the outside is sealed and the cheat line gleams, we move into the cabin for the full interior detail—vacuum, leather conditioning, galley and lav deep-clean, carpet extraction if the client approves it—then finish with disinfection of the flight deck and cabin. The photographic report goes to the chief pilot or the broker the same day we sign the tech log. If the aircraft is due for a pre-buy inspection or a delivery flight, we time the handover so the jet can depart within the aerodrome's daylight window.

What does decontamination and polish actually do?

Paint decontamination removes everything a wash cannot: brake dust sintered into the belly, insect proteins on the leading edges, fuel stains around the filler necks, tree sap if the aircraft has sat under cover at a grass strip, and the fine layer of industrial fallout that settles on any jet parked outdoors for more than a week. We use a clay bar or a chemical decon depending on the paint system and the level of contamination; the goal is a molecularly clean surface that feels like glass under a gloved hand.

The single-stage polish follows immediately. We work panel by panel with a rotary and a finishing compound that cuts lightly and leaves gloss, not haze. The polish fills micro-scratches, evens the reflection and preps the paint for a synthetic sealant that will shed water for three to six months. Brightwork—nacelle lips, gear doors, windscreen surrounds—gets its own treatment: metal polish and a microfibre buff, then a wipe with a hydrophobic agent so the next rain beads instead of streaking. The result is an aircraft that looks correct in photographs and does not embarrass the flight department when the principal walks across the ramp with a prospective buyer.

Can you detail between ski-season legs at Sion?

Yes, and we do it often. The Valais winter season runs December through March, with peaks around Christmas, New Year and February half-term. Operators fly in Friday evening, the principal skis Saturday and Sunday, and the aircraft departs Monday morning for Geneva, Zurich or back to home base. That 48-hour window is too short for a complete detail, but the gaps between trips—especially in January—stretch to five or seven days, and that is enough if we have hangar space and a firm departure slot.

We coordinate directly with the handler and the flight-department scheduler. If the aircraft will sit at Sion from Monday afternoon to the following Sunday morning, we can start the exterior work Tuesday at first light, finish the cabin by Thursday evening, and leave Friday and Saturday as buffer in case weather or a parts delay pushes the schedule. The photographic report goes to the chief pilot Friday night, and the jet is ready for its pre-flight inspection Sunday at 08:00 local. The key is locking in the hangar and confirming the departure slot before we mobilise; Sion is busy in winter, and a missed slot means the aircraft stays another day or repositions without the detail finished.

What happens if the aircraft is AOG or the weather closes the valley?

We pause the work and adjust the timeline. Sion's Alpine location means weather can shut the field with little notice: cloud bases drop into the valley floor, crosswinds exceed limits on runway 07/25, or snowfall closes the apron until the ploughs finish. The instrument approaches rely on an IGS and RNP procedures, and the airport runs a dedicated pilot qualification for IFR work, but if the cloud is below minimums the aircraft does not move regardless of the detail schedule.

If the jet goes AOG—a generator fault, a hydraulic leak, a software flag that grounds the aircraft until a tech flies in from the OEM—we stop polishing, cover the work we have completed, and wait. The cabin stays sealed so dust and hangar air do not undo the interior detail. Once the aircraft is released and the new departure slot is confirmed, we resume exactly where we left off. The photographic report notes any delay and the reason for it, so the client understands why a three-day detail stretched to five. We do not charge for weather days or AOG days; you pay for the work we complete, not the days the aircraft sat waiting for a part or a clearance.

Questions operators ask about Complete Detail at Sion

How much hangar time does a complete detail need at Sion?

Two to five days, depending on aircraft size and paint condition. A super-midsize jet in reasonable condition takes two full days; an ultra-long-range airframe with a season's worth of contamination can stretch to five. We prefer to work inside a hangar at Sion in winter to avoid cold-soak and snow interference, and both Signature and Alpinejet offer hangar space for visiting aircraft up to 77,000 kilograms.

Can you detail the aircraft while the crew rests between ski-season legs?

Yes, if the gap is five days or longer and we have hangar space confirmed. We coordinate with the handler and the flight-department scheduler to start the exterior work the day after arrival and finish the cabin with enough buffer for a pre-flight inspection. The key is locking in the hangar and confirming the departure slot before we mobilise, because Sion is busy in winter and a missed slot means the aircraft stays another day.

What does paint decontamination remove that a wash does not?

Brake dust, insect proteins, fuel stains, tree sap and industrial fallout bonded to the paint. Decontamination uses a clay bar or chemical treatment to lift contamination that a rinseless wash cannot touch. The result is a molecularly clean surface that feels like glass and accepts polish evenly, restoring gloss and preparing the paint for a hydrophobic sealant.

Why does Sion's daylight-only schedule matter for detailing?

It shortens the working day and compresses winter timelines when FBO hours also shrink. The aerodrome closes at the end of daylight—latest 18:00Z in summer and 19:00Z in winter—and FBOs staff terminals only 08:00 to nightfall from October through March. Any movement outside those windows needs prior permission, so we schedule the work to finish with enough buffer for a daylight departure.

Do you disinfect the cabin as part of the complete detail?

Yes, we disinfect all high-touch surfaces in the cabin and flight deck after the interior detail. Once the vacuum, leather conditioning and galley deep-clean are finished, we disinfect seat controls, armrests, galley handles, lav fixtures and the flight-deck control column and throttles. The disinfection pass uses an aviation-approved agent that leaves no residue and no odour.

What is the photographic report, and when do we receive it?

A before-and-after record of the work, delivered the same day we sign the tech log. The report documents the condition of the aircraft before we start, the decontamination and polish process, and the finished result. It goes to the chief pilot or the broker as a PDF the same day we complete the work, so you have a visual record for a pre-buy inspection or a sale listing.

Can you restore brightwork on the nacelles and gear doors?

Yes, brightwork polish is included in the complete detail. We treat nacelle lips, gear doors and windscreen surrounds with metal polish and a microfibre buff, then apply a hydrophobic agent so the next rain beads instead of streaking. The goal is to bring back the mirror finish that fades after a season of exposure to Alpine weather.

What happens if weather or an AOG delay pushes the schedule?

We pause the work, cover what we have completed, and resume once the aircraft is released. Sion's Alpine location means weather can close the field with little notice, and AOG events ground the aircraft until a part or a tech arrives. We do not charge for weather days or AOG days; you pay only for the work we complete. The photographic report notes any delay and the reason for it.

Is a complete detail worth the cost before a sale or a pre-buy inspection?

Yes, because it resets the aircraft's appearance to a reference standard that photographs well and reassures buyers. A pre-buy inspector or a prospective buyer will notice dull paint, tarnished brightwork and a cabin that smells of use. A complete detail removes those signals and presents the aircraft as maintained, not merely flown. The cost of the detail is a fraction of the price adjustment a buyer will demand if the jet looks tired on the ramp.

Do you work on the ramp or only inside the hangar at Sion?

We prefer the hangar in winter to avoid cold-soak and snow, but we can work on the ramp in summer if hangar space is tight. Sion has ample hangar capacity—up to 77,000 kilograms—and we use it whenever the forecast calls for snow or temperatures that would freeze rinseless product on the fuselage. In summer, when the weather is stable and the apron is dry, we can detail on the ramp if the hangar is occupied, but the hangar is always the first choice for a multi-day complete detail.

Other services at Sion