Exterior Dry Wash at Perugia San Francesco d'Assisi (LIRZ)
Waterless exterior cleaning on the apron at LIRZ—no bay, no runoff, full documentation.
Exterior Dry Wash at Perugia San Francesco d'Assisi serves flight departments operating super-midsize through ultra-long-range jets into central Umbria. The service runs directly at the Delta Aerotaxi FBO stand, using aviation-grade waterless chemistry to lift bug residue, exhaust soot and hydraulic film from fuselage, wings, empennage and nacelles without runoff or wash-bay delays. Belly degreasing, gear-bay cleaning and brightwork touch-up are standard; turnaround is three to eight hours depending on airframe size. Every wash includes a digital photo report filed with the tech log, and our crew coordinates PPR and customs through the handler before arrival.
01/19 · 2199 m
AIP and airport data697 ft
10 km
Perugia city centre1 on the airport
independent, no affiliationWhy choose a waterless process at a regional Italian airport?
Perugia sits 697 feet above sea level in the Umbrian hills, ten kilometres from the city centre and roughly halfway to Assisi. Summer heat and the fine dust stirred by the Umbria Airlink bus route leave a visible haze on dark paint, while winter moisture traps exhaust particulate against the belly. A dry wash removes all of it without taxiing to a remote bay or waiting for a wash rack that does not exist at LIRZ.
Waterless chemistry encapsulates dirt at the molecular level and lifts it into suspension within the product film; microfibre applicators carry the emulsion away without scratching gel coat or polished aluminium. There is no overspray drifting onto neighbouring stands, no grey runoff pooling under the APU, and no need to coordinate drainage with the airport authority. The handler appreciates the tidiness, the captain appreciates the speed, and the paint appreciates the absence of hard water.
What changes at Perugia San Francesco d'Assisi for a detailing crew?
The airport operates a single runway—01/19, 2199 metres—with general-aviation movements on a PPR basis. The operator, SASE, requires written notice between fifteen days and ten hours before arrival, copied to Delta Aerotaxi; the FBO lists PPR coordination as part of its service suite, so we fold that into the pre-arrival brief and ensure the request goes out as soon as you confirm the slot. Customs are on site—LIRZ is an airport of entry—and the FBO arranges the officer call-out if your flight is arriving from outside Schengen.
Because the field is not slot-coordinated, schedule changes are easier to manage than at Milan or Rome, but the PPR window means we still need ten hours' minimum notice for an unplanned diversion. One handling agent works the apron, so there is no ambiguity about who escorts our crew airside or where the GPU will be positioned during the wash. Event peaks—Umbria Jazz in July and Eurochocolate in autumn—bring visitor traffic into Perugia, which can tighten stand availability; we watch the calendar and recommend booking those weeks early.
What does the handler expect from a third-party detailing crew at LIRZ?
Delta Aerotaxi holds the airside-pass responsibility, so our team arrives with passport, driving licence and insurance certificate ready for the handler's security log. We bring our own equipment—no borrowing GPU carts or work stands—and we notify the FBO in writing forty-eight hours before arrival with crew names, vehicle registration and estimated time on stand. If the aircraft will remain on the apron overnight, we ask the handler to confirm that external power and chocks will stay in place until we finish the following morning.
The handler expects us to keep the work envelope within the stand markings, to place drip trays under any nacelle we are degreasing, and to leave the area cleaner than we found it. Waste goes into our own bags and travels back to our van; nothing is left for the FBO to dispose of. If we need walkaround access during a busy July afternoon, we ask the handler to position the aircraft nose-in so that the empennage work does not block taxiway sightlines. Courtesy costs nothing, and it ensures that the next PPR approval comes through without hesitation.
How do you document an exterior dry wash for the tech log?
We photograph the airframe in six standard views—port profile, starboard profile, nose quarter, tail quarter, belly aft of the nose gear, and a detail of any area that arrived with visible staining—before we lay a glove on the paint. Those images go into a PDF report that records date, location, ICAO code, aircraft registration, Hobbs or tach time if the crew shares it, ambient temperature, and a checklist of every surface we treated: fuselage panels, wing leading edges, nacelle inlets and exhaust cones, belly stringers, gear doors, static ports (inspected, never touched), and all exterior lights.
After the wash we shoot the same six angles again, append them to the report, and email the PDF to the captain and the flight-department manager within two hours of finishing. If the tech log lives in an electronic maintenance system, we can push the report directly into the airframe file. The documentation proves to the next line station that the belly was degreased in Italy, not left to bake onto the skin for another three sectors, and it gives the chief pilot a timestamped record for the annual appearance budget.
What does a belly degrease involve on a dry-wash turnaround?
Hydraulic mist, oil weeps and landing-gear spray throw a brown film across the belly stringers, gear bays and aft fuselage; left alone, the film carbonises in the slipstream and turns into a tarry layer that a simple dry wash will only smear. We apply a biodegradable degreaser to the affected panels, allow it to dwell for five minutes, then agitate with a stiff brush and wipe with heavy-duty microfibre. Gear bays receive the same treatment, though we mask any exposed cannon plugs and keep all chemistry away from brake assemblies and torque links.
The process adds roughly forty-five minutes to the overall turnaround for a super-midsize airframe, longer if the belly has not been touched in six months. We lay absorbent mats under the nacelles to catch the runoff—it is biodegradable, but the handler still prefers not to see it pooling on the stand—and we include before-and-after belly shots in the photo report. A clean belly reduces drag measurably and stops the next FBO from quoting a two-stage exterior detail when a simple maintenance wash would have sufficed.
How do access and airside logistics work at a single-FBO field?
With one handling agent on the apron, coordination is straightforward: Delta Aerotaxi issues the escort, confirms the stand number, and tells us where to park the van. We drive airside through the service gate, present our pass and insurance, and follow the handler's vehicle to the aircraft. If the jet is cold-soaked from an early-morning arrival, we wait for the cabin door to open and the APU to spool up before we start; waterless product performs poorly on frozen gel coat, and we would rather delay thirty minutes than leave streaks.
The single runway means we occasionally pause for wake turbulence if a regional turboprop departs on 19 while we are working the port wing, but traffic density is low enough that the interruptions are brief. When the wash is complete, we stow the equipment, collect the mats, and escort ourselves back to the service gate under the handler's remote supervision. The FBO emails a copy of the gate log to our office, which closes the loop on insurance and security compliance, and the aircraft is clean, dry and ready to reposition to the next sector within the planned turnaround window.
Questions operators ask about Exterior Dry Wash at Perugia San Francesco d'Assisi
How long does an exterior dry wash take at Perugia?
Three to eight hours, depending on aircraft size and the condition of the belly. A super-midsize airframe in regular service typically takes four to five hours; an ultra-long-range jet with a neglected belly and full nacelle degrease can reach eight. We provide a firm estimate once we know the registration and the date of the last exterior clean.
Do you need a wash bay or water hookup at LIRZ?
No; the dry wash runs entirely on the stand using waterless chemistry. All cleaning, degreasing and brightwork touch-up happens at the FBO apron with no runoff, no hoses and no wash-rack reservation. The handler appreciates the lack of grey water, and you avoid the delay of taxiing to a remote bay that does not exist at Perugia.
Will a dry wash remove exhaust soot and hydraulic film?
Yes; we use separate degreasers for the belly and nacelles, followed by waterless polish on the fuselage. Exhaust carbon around the APU outlet and hydraulic mist on the belly require a biodegradable degreaser and stiff brush; the fuselage, wings and empennage are then treated with aviation-grade waterless wash that encapsulates and lifts remaining contaminants without scratching the paint.
How do you handle PPR coordination for the detailing crew?
We submit the SASE request on your behalf, copied to Delta Aerotaxi, as soon as you confirm the arrival slot. Perugia requires written PPR between fifteen days and ten hours before arrival. We prepare the request with crew names, vehicle registration and stand-time estimate, send it to the airport Operations Office and the FBO, and forward you the approval once it comes back.
What documentation do you provide after the wash?
A PDF photo report with before-and-after images, surface checklist and timestamp, emailed within two hours. The report includes six standard views before we start, a checklist of every treated surface—fuselage, wings, nacelles, belly, gear bays, lights—and the same six views after completion. We email it to the captain and flight-department manager, or push it into your electronic maintenance system if you prefer.
Can you work around a quick turnaround or an overnight stop?
Yes; we adapt to your schedule, whether that is a four-hour slot or an overnight with morning departure. For a short turnaround we focus on fuselage, wings and nacelles, deferring the belly to the next longer stop. For an overnight we start after the passengers disembark, work through the evening, and have the aircraft clean and dry by the time the crew arrives the next morning.
Do you touch avionics, static ports or pitot probes?
No; we inspect them visually and note their condition in the report, but we never apply chemistry or pressure. Static ports, pitot tubes, angle-of-attack vanes and any external sensor are photographed and logged as 'inspected, not treated.' If we see a blocked port or a damaged cover, we note it in the report so the captain can raise it with maintenance.
What happens if the aircraft diverts to Perugia with less than ten hours' notice?
We submit an expedited PPR request and coordinate with the FBO; most unplanned arrivals are approved within two hours. SASE allows PPR requests down to ten hours before arrival, and the FBO has a direct line to the Operations Office. We file the request immediately, confirm stand availability and customs if needed, and mobilise our crew as soon as the approval comes through.
Does a dry wash protect the paint as well as a traditional water wash?
Yes; high-quality waterless products leave a hydrophobic polymer layer that sheds water and resists new contamination. Aviation-grade dry-wash chemistry contains synthetic polymers that bond to the paint and create a slick, hydrophobic surface. The protection lasts four to six weeks in normal service, and the absence of hard-water minerals means no new spotting after the next rain shower.
Can you clean the exterior windows and lights without streaking?
Yes; we use separate glass cleaner on windows and acrylic polish on lights, both applied with lint-free microfibre. Windscreens, cabin windows and door glass are treated with an ammonia-free aviation glass cleaner; navigation lights, strobes and landing lights receive acrylic-safe polish. We finish with a dry buff to eliminate streaks, and we include close-up shots of the windows in the photo report.