Call now Book a Service
LOWL · LNZ · Linz (Hörsching), Austria

Complete Detail at Linz (LOWL)

Multi-day deep restoration—paint, brightwork, cabin—at the General Aviation Center in Hörsching.

Complete Detail at Linz is the reference standard for operators preparing a super-midsize or larger business jet for sale, delivery or the start of a season. Working from the General Aviation Center's dedicated apron, we combine exterior wash, paint decontamination and single-stage polish, brightwork restoration, full interior detail and cabin disinfection in a single visit lasting two to five days. The service is built around a photographic report: every panel, every seam and every surface documented before work begins and again at handover, so chief pilots and pre-buy surveyors have a clear record of what was done.

Runway

08/26 · 3000 m

AIP and airport data
Elevation

980 ft

Operating hours

Aerodrome administration and customs Mon-Fri 05:30-23:00 local, Sat-Sun 06:00-23:00 local (AIP Austria LOWL AD 2.3: MON-FRI 0430-2200 UTC winter / 0330-2100 UTC summer, SAT-SUN 0500-2200 / 0400-2100 UTC; identical to the SCA opening-hours table)

Night curfew outside those hours (Schedule Coordination Austria); AIP: Mon-Fri outside operating hours only up to 4 cargo movements on request, of which max 2 after 01:30 local
Distance

10.5 km

Linz city (AIP: 5.7 NM SW of Linz; de.wikipedia rounds to 12 km SW)
Handling agents

1 on the airport

independent, no affiliation
GA terminal

General Aviation Center housed in a separate terminal; coordinates passport/customs checks, refuelling, cleaning, VIP service and catering

What changes at Linz for a complete-detail turnaround?

Linz sits at 980 feet, ten and a half kilometres southwest of the city, with a single 3,000-metre runway and a separate general-aviation terminal operated by the General Aviation Center. The airport closes every night at 23:00 local, reopening at 05:30 on weekdays and 06:00 at weekends; aerodrome administration and customs follow the same hours. That curfew shapes the work window: a multi-day detail must either finish each evening by 23:00 or be arranged on request with the GAC if an overnight stay on stand is acceptable.

The airfield is also a military base—Fliegerhorst Vogler lies south of the runway—so expect security procedures and occasional military movements on the airside. The GAC coordinates passport and customs checks, refuelling, cleaning and VIP service from its own apron, which keeps business-aviation traffic separate from the airline terminal. Linz is IATA Level 2, schedules facilitated rather than fully slot-coordinated; schedule requests go to SCA with a copy to the airport, but slots are not required and PPR is straightforward.

Handlers at the airport expect third-party specialist crews to arrive with their own airside escort or to be met at the security gate. We carry our own equipment, our own water and our own insurance; the GAC apron has GPU and ground-power access, so the aircraft can remain live for avionics and environmental systems throughout the detail if the tech log allows it.

Why does a complete detail take two to five days?

Because the work is sequential and each stage must cure or dry before the next begins. We start with a dry wash or rinseless exterior clean to lift dust, exhaust residue and de-icing salts without scratching the paint. Once the surface is clean and dry, we apply a chemical decontamination treatment to pull embedded iron particles, tar and industrial fallout from the clear coat—contaminants that a wash alone will not shift. The paint is then clayed by hand, panel by panel, to remove anything still bonded to the surface.

Single-stage machine polishing follows: we correct light oxidation, swirl marks and water spots, working in overlapping passes with a finishing polish that leaves a uniform gloss. Brightwork—nacelle lips, winglet leading edges, windscreen surrounds—is polished separately with a metal-safe compound. While the exterior cures, the cabin team works through the interior: vacuuming, shampooing soft furnishings, cleaning and conditioning all OEM materials, treating galley and lavatory surfaces, and disinfecting high-touch areas in the flight deck.

The final half-day is reserved for a second exterior inspection, a no-touch wipe of avionics covers and static ports, and the photographic report. If weather turns or if contamination is heavier than the pre-arrival survey suggested, the schedule stretches; if the aircraft is already well-maintained and the interior is light, we can compress the work into two full days.

What does the photographic report include?

A time-stamped record of the aircraft before we touch it and again at handover, delivered as a digital album with captions and close-ups of any area that required extra attention. We photograph the fuselage from nose to tail in natural light, both sides, the belly as far as the gear bays allow, the upper surfaces from a ladder, and every control surface, nacelle and winglet. Inside, we document cabin seating, side panels, the galley, the lavatory, carpets, and the flight-deck seats and glare shield.

The report is not marketing material; it is evidence. Pre-buy inspectors use it to confirm that paint correction was carried out without cutting through the clear coat. Sellers include it in the aircraft's logbook file to show prospective buyers that the airframe was professionally maintained. Fleet managers use the before images to track how quickly contamination builds up on a particular route or during a particular season, then adjust the cleaning interval accordingly. If a dispute arises about the condition of a cabin material after detailing, the photographs settle it.

How does Austrian weather affect paint and cabin between details?

Linz has a temperate continental climate: cold winters with frequent de-icing, warm summers with afternoon convection, and year-round humidity that accelerates the bonding of airborne contaminants to paint. Aircraft operating through Central Europe pick up iron particles from rail-freight corridors, road dust from the Danube valley, and biological matter—pollen, tree sap, insect strikes—during the growing season. All of it embeds in the clear coat if left for more than a few weeks.

Winter brings its own load: Type I and Type IV de-icing fluids leave a sticky residue on the belly and lower fuselage, and road salt thrown up by ground vehicles during apron movements coats the gear bays and nacelle interiors. If the aircraft sits cold-soaked overnight after a flight, condensation forms on the paint and traps whatever settled during taxi. Inside, humidity works its way into carpets and soft furnishings, and cabin air that is not fully cycled between legs allows odours to build up in the environmental system.

A complete detail once or twice a year resets the baseline: the paint is decontaminated and protected, brightwork is sealed, and the cabin is deep-cleaned and disinfected. Operators who run a regular programme at Linz—quarterly or seasonal washes with an annual full detail—find that each turnaround takes less time because contamination never has the chance to bond hard.

Can you complete-detail an aircraft that is AOG or waiting for parts?

Yes, and the economics often make sense: the aircraft is already on the ground, the handler has arranged parking, and the downtime can be used for something other than watching the tech log. We coordinate with the maintenance provider to confirm that the airframe will remain accessible—no cowlings removed, no scaffolding around the fuselage—and that we can work around any open panels or static-discharge points. If the aircraft is waiting for a part that will take a week to arrive, a complete detail fits neatly into the gap.

The one constraint is power: we need the cabin environmental system running to control humidity during interior work, and we need the flight-deck live to avoid any risk of moisture ingress into avionics bays. If the aircraft cannot be powered from a GPU or if the batteries are being replaced, we defer the interior detail until the electrical system is serviceable again. The exterior work—wash, decontamination, polish, brightwork—can proceed regardless, as long as the apron is dry and the temperature is above five degrees Celsius for the compounds to cure properly.

How do you manage a complete detail for an aircraft based at Linz year-round?

We treat it as scheduled maintenance: the detail goes into the aircraft's annual plan at the same interval as a phase inspection, and the date is fixed three months in advance so the operator can route the aircraft back to Linz with an empty leg. For a fleet programme, we stagger the schedule so that one airframe comes through every quarter; that way the cabin crew and the chief pilot see the process once and know what to expect for the rest of the fleet.

The GAC is notified four weeks ahead with the registration, the MTOW, the requested arrival and departure days, and a note that the aircraft will need apron parking and GPU access for up to five days. We send our own team from Italy with all equipment and consumables; the handler provides the airside escort and arranges customs if the aircraft is arriving from outside Schengen. If the operator wants the aircraft to remain in the hangar rather than on the apron—common in winter or if the paint is fresh—we coordinate hangar availability directly with the GAC and adjust the schedule to fit their door-open hours.

Recurring work at a single base has a rhythm: we learn the aircraft's quirks, we know which cabin materials need extra care, and we can track how the paint ages over successive details. The photographic reports build into a visual maintenance history that is worth having when the aircraft eventually goes to market.

Questions operators ask about Complete Detail at Linz

How long does a complete detail take at Linz?

Two to five days, depending on aircraft size, contamination level and whether the work is done in a hangar or on the apron. Most super-midsize and large-cabin jets require three to four days for the full sequence: exterior wash, decontamination, single-stage polish, brightwork, interior detail and disinfection. Light jets or aircraft already on a regular programme can be turned around in two days; heavily contaminated airframes or those needing extra paint correction may stretch to five.

Do I need to arrange anything with the General Aviation Center before the detail?

Yes: notify the GAC four weeks ahead with the registration, arrival and departure dates, and parking requirements. The GAC coordinates all general-aviation movements at Linz, including apron parking, GPU access, customs and refuelling. We work directly with the handling agents present at the airport to arrange our airside escort and to confirm that the apron or hangar will be available for the full duration of the detail.

Can you work overnight at Linz?

Only on request and within the airport's operating hours, which end at 23:00 local every night. Linz closes at 23:00 and reopens at 05:30 on weekdays or 06:00 at weekends. Multi-day details are scheduled to finish each evening by curfew, or we arrange with the GAC for the aircraft to remain on stand overnight if the operator prefers. Work outside those hours requires prior coordination and is limited to a few cargo movements per night.

What is included in the photographic report?

Time-stamped images of the entire exterior and interior, before and after, with captions and close-ups of any areas requiring extra attention. The report documents the aircraft's condition at the start of the detail and again at handover. It includes fuselage panels, control surfaces, nacelles, winglets, belly, cabin seating, galley, lavatory, carpets and flight-deck surfaces. Pre-buy inspectors, sellers and fleet managers use it as evidence of the work carried out.

Can you detail an aircraft that is AOG at Linz?

Yes, as long as the airframe remains accessible and the cabin can be powered for environmental control. We coordinate with the maintenance provider to confirm that no scaffolding or open panels will obstruct the fuselage, and that the aircraft can be powered from a GPU. Exterior work—wash, decontamination, polish—can proceed even if the cabin is not powered, but interior detailing requires the environmental system to control humidity.

How often should a complete detail be carried out?

Once or twice a year for most operators; more frequently if the aircraft is being prepared for sale or operates in harsh environments. Annual or biannual complete details keep paint and cabin in reference condition. Operators who fly through Central Europe year-round, especially in winter with de-icing fluids and road salt, benefit from a spring and autumn schedule. Aircraft coming to market or undergoing pre-buy inspection are detailed immediately beforehand.

What does paint decontamination remove that a wash does not?

Embedded iron particles, tar, tree sap, industrial fallout and other contaminants bonded to the clear coat. A wash lifts loose dirt and dust; decontamination uses a chemical treatment and clay bar to pull out anything that has bonded to the paint over weeks or months. Left untreated, these contaminants oxidise, stain the clear coat and create a rough surface that accelerates further contamination.

Do you detail the belly and gear bays?

Yes: the belly is washed and polished as part of the exterior work; gear bays are cleaned of fluid residue and road salt. Belly panels and nacelle undersides are treated the same as the fuselage—decontaminated, polished and inspected. Gear bays are cleaned of de-icing fluid, hydraulic mist and salt, but we do not touch brake assemblies, hydraulic lines or any components flagged in the tech log as requiring maintenance access only.

Can the aircraft remain live during the detail?

Yes, if the tech log allows and a GPU is available; we need power for cabin environmental systems during interior work. The GAC apron has GPU access, so the aircraft can stay powered throughout the detail. We follow no-touch procedures around avionics bays, pitot covers and static ports, and we coordinate with the flight crew to ensure that any systems left live—flight-deck displays, cabin lighting—do not interfere with the work.

How do I get a quote for a complete detail at Linz?

Send the aircraft type, registration, preferred dates and any specific requests to our operations team. We prepare a fixed-price quote based on the aircraft category, the expected condition and the requested turnaround time. If you have photos from a recent exterior inspection or notes on cabin wear, include them; they help us estimate the work accurately and avoid schedule surprises on the day.

Other services at Linz