Complete Detail at Lampedusa (LICD)
Pre-sale polish and full interior detail on the Sicilian island—coordinated slots and seasonal apron pressure.
Complete Detail at Lampedusa is the reference standard before a pre-buy inspection, a sale or the start of a charter season: exterior wash, paint decontamination and single-stage polish, brightwork, full cabin disinfection and a photographic report in one visit. The service is built for flight departments and charter operators who need the aircraft ready to show or to fly revenue legs immediately afterward. We work on the apron or in covered space when available, under coordination with the airport operator, and schedule around your allocated slot and the summer peak when apron congestion is routine.
08/26 · 1795 m
AIP and airport data70 ft
0.5 km
Lampedusa town centreWhat changes at Lampedusa between summer and winter?
Lampedusa is a fully coordinated Level 3 airport—slots are required year-round, even when the island is quiet. The single runway, 08/26 at 1795 metres, sits just 70 feet above sea level and half a kilometre from the town centre. Traffic is strongly seasonal: July and August bring intense air activity, apron congestion and short turnarounds driven by scheduled and charter tourism flights. Expect tight stand allocation, limited room to position a GPU or air-start unit, and pressure to complete the turnaround inside your slot window.
Winter is the opposite. The apron empties, handlers have time, and you can plan a two- or three-day detail without competing for space. If you are scheduling a complete detail—paint decontamination, brightwork polish, full cabin work—the low season offers flexibility that summer simply does not. The airport operator, AST Aeroservizi, runs the apron and all ground handling directly from the head office at Contrada Cala Francese; there is no separate FBO, so every request goes to the same desk.
For a complete detail requiring two to five days, winter or shoulder months are strongly preferred. Summer slots are workable if the aircraft will remain on the island between charter legs, but apron access and handler availability must be confirmed weeks ahead.
How do you coordinate a multi-day detail with the airport operator?
Because AST Aeroservizi is both airport operator and handler, the conversation starts with a single point of contact. We submit the request—aircraft type, arrival and departure slots, duration on stand, requirement for GPU or external power, and whether covered space is available—and the operator confirms feasibility. If the aircraft is scheduled for back-to-back charter legs, we ask for the stand assignment between flights and plan the detail around that window.
A complete detail typically takes two to five days. We prefer covered space to control dust, manage brightwork polish without direct sun, and protect the cabin during disinfection. If no hangar is available, we work on the apron and adjust the sequence: exterior wash and decontamination first, then brightwork, then interior once the cabin has cooled. The operator needs to know our crew size, vehicle access airside, and whether we require an escort or hold our own passes.
Turnaround pressure in summer means the stand may be needed on short notice. We build a buffer into the schedule and keep a direct line to the handler so that if a slot moves or an AOG diverts in, we can pause work, reposition the aircraft if required, and resume once the stand is clear again.
What does the paint decontamination and polish involve?
Paint decontamination removes everything that a rinseless wash cannot: bonded contaminants, industrial fallout, exhaust residue, salt film and the fine layer of oxidation that dulls the finish over time. We use a clay bar or chemical decon across every painted surface—fuselage, nacelles, winglets, tail—then follow with a single-stage machine polish to restore gloss and depth. The process is methodical: we work panel by panel, inspect under oblique light, and do not move on until the surface is clean to the touch and uniform in reflection.
Brightwork—leading edges, nacelle lips, gear-door hinges, any exposed aluminium or stainless—gets a separate polish with a metal-specific compound. We mask adjacent paint, work by hand or with a small machine, and finish with a sealant so the metal stays bright between details. The result is an aircraft that photographs well and presents like new inventory.
The photographic report captures before-and-after images of every major surface, date-stamped and organised by zone. If the aircraft is heading to a pre-buy inspection or a delivery flight, the report becomes part of the handover documentation.
How does a complete detail fit into a charter rotation at Lampedusa?
Charter operators often use Lampedusa as a turnaround point: inbound positioning leg, a day or two on the ground, then revenue sectors through the Mediterranean or back to the mainland. A complete detail fits naturally into that gap, provided the slots are coordinated and the handler knows the aircraft will occupy the stand for the full window. We have worked on aircraft between back-to-back charters in summer—tight, but achievable if the exterior is done on day one and the cabin on day two, with final brightwork and inspection on departure morning.
The alternative is to schedule the detail at the end of a charter series, when the aircraft will remain on the island for several days before repositioning. That gives us time to work without pressure, allows the handler to assign a quieter stand, and means the cabin can be fully disinfected and left to air overnight. If the aircraft is part of a fleet program, we coordinate the detail with the next maintenance interval so that both happen in sequence.
Recurring work—quarterly or biannual complete details for a managed fleet—requires advance planning with the operator. We book slots, confirm stand availability, and align our schedule with yours so the aircraft is ready to fly the moment you need it.
What happens if the aircraft is cold-soaked or if weather delays the detail?
A cold-soaked aircraft—one that has just landed from altitude or has been parked overnight in winter—needs time before we can begin interior work. Condensation inside the cabin, especially on avionics and control surfaces, means we wait for the airframe to stabilise at ambient temperature. On the apron in summer, that takes an hour or two; in winter or early morning, it can take half a day. We coordinate with the handler to connect GPU or run the APU if needed to bring cabin temperature up and circulate air.
Weather rarely stops work at Lampedusa—the island is dry most of the year—but wind can. If we are polishing brightwork or applying sealant on the apron and the wind picks up, we pause until conditions settle. The airport operator is pragmatic: if a delay pushes us past the original departure slot, we request an extension or a new slot and adjust the schedule accordingly.
For a complete detail, we build contingency into the timeline. If the aircraft is due to depart on day three and weather or a cold-soak delays us by six hours, we compress the final inspection and photographic report but do not skip steps. The standard is the same whether the detail takes two days or five.
Why choose a complete detail at Lampedusa rather than at a mainland base?
Lampedusa offers something that congested mainland airports do not: time. Outside the summer peak, the apron is quiet, the handler is responsive, and the aircraft can sit undisturbed for as long as the detail requires. There is no competing traffic pushing you off the stand, no curfew cutting the working day short, and no need to reposition between facilities. The island is also a natural staging point for Mediterranean charters, so the detail happens where the aircraft is already scheduled to be.
A complete detail here is not about convenience—it is about the standard. Paint decontamination, single-stage polish, brightwork and full cabin disinfection take time, and they require space to lay out equipment, control dust and inspect every surface under proper light. Lampedusa gives us that space, and the airport operator understands that a multi-day detail is a legitimate use of a stand, not an inconvenience.
If the aircraft is heading to a pre-buy inspection, a delivery flight or the start of a charter season, a complete detail at Lampedusa ensures it arrives in the condition the next operator expects. The photographic report, the polished brightwork and the disinfected cabin are not extras—they are the baseline for a professional handover.
Questions operators ask about Complete Detail at Lampedusa
How long does a complete detail take at Lampedusa?
Two to five days, depending on aircraft size and whether covered space is available. Most super-midsize jets require two to three days; ultra-long-range aircraft or those with significant brightwork can take four to five. We schedule the work around your allocated slot and coordinate with the airport operator to confirm stand availability for the full duration.
Do you need a slot to perform a complete detail at Lampedusa?
Yes—Lampedusa is a Level 3 coordinated airport, and slots are required for arrival and departure year-round. Even if the aircraft will remain on the ground for several days, the arrival and departure slots must be allocated through Assoclearance. We help coordinate the request with the handler and build the detail schedule around your confirmed slot times.
Can you work on the apron if no hangar is available?
Yes—we perform complete details on the apron when covered space is not available. We adjust the sequence to manage sun, wind and dust: exterior decontamination and polish early in the day, brightwork when the metal is cool, and interior work once the cabin has stabilised. The standard remains the same whether we work under cover or in the open.
What is included in the photographic report?
Before-and-after images of every major surface, date-stamped and organised by zone. The report captures fuselage, nacelles, winglets, tail, brightwork, cabin and flight deck. It is delivered digitally at the end of the detail and can be used for pre-buy documentation, delivery handover or fleet records.
How do you handle apron congestion during the summer peak?
We schedule complete details in the low season or build buffer time into summer turnarounds. July and August bring intense traffic and tight stand allocation at Lampedusa. If the aircraft must be detailed in summer, we confirm stand assignment weeks ahead, keep a direct line to the handler and pause work if the stand is needed for an unscheduled arrival or AOG.
Who do you coordinate with for ground handling at Lampedusa?
AST Aeroservizi, which operates the airport and provides all ground handling services on site. There is no separate FBO—AST runs the apron, passenger services and ground handling from the head office at Contrada Cala Francese. Every request for stand assignment, GPU, airside access or schedule changes goes through the same point of contact.
Can you fit a complete detail between charter legs?
Yes, if the aircraft will remain on the ground for at least two full days between flights. We coordinate with the handler to confirm stand availability and align the detail with your slot times. Exterior work happens on day one, interior and brightwork on day two, with final inspection on departure morning. Tight, but workable if planned in advance.
What happens if weather or a cold-soaked aircraft delays the schedule?
We build contingency into the timeline and adjust the sequence without skipping steps. If condensation or low cabin temperature delays interior work, we wait for the airframe to stabilise and use the time for exterior decontamination or brightwork. If a delay pushes past your departure slot, we request an extension through the operator and compress the final inspection as needed.
Do you offer recurring complete details for managed fleets at Lampedusa?
Yes—we schedule quarterly or biannual details aligned with your maintenance intervals and charter rotation. Recurring work requires advance coordination with the airport operator to secure slots and stand availability. We align the detail with your maintenance schedule so both happen in sequence, and the aircraft is ready to return to service immediately.
Why perform a complete detail at Lampedusa rather than on the mainland?
Lampedusa offers quiet apron conditions outside the summer peak and a handler who understands multi-day details. The island is a natural staging point for Mediterranean charters, and the airport operator is accustomed to aircraft remaining on stand for several days. You get the time and space needed for paint decontamination, brightwork polish and full cabin disinfection without the pressure of a congested mainland base.