Call now Book a Service
LFLB · CMF · Chambéry, France

Complete Detail at Chambéry Savoie Mont Blanc (LFLB)

Reference-standard preparation on the ramp at France's winter gateway to Courchevel and Val d'Isère

Complete Detail at Chambéry Savoie Mont Blanc is a two-to-five-day exterior and interior restoration carried out on the apron between ski-season charter legs, before a pre-buy inspection or ahead of a sale. Chief pilots and charter operators staging super-midsize or larger aircraft through LFLB during the December-to-April peak book the service when a delivery standard is required without repositioning to a southern European hangar. Paint decontamination, single-stage polish, brightwork restoration and cabin disinfection are completed outdoors at 779 feet in an Alpine climate, documented by before-and-after photography and coordinated with the handling agent through the MyHandering portal.

Runway

18/36 · 2020 m, 18L/36R (grass) · 700 m

AIP and airport data
Elevation

779 ft

Operating hours

Not H24. AIP: ATS 0700-2000 UTC (Saturdays in the winter facilitation period 0600-2000 UTC), handling on request with 48 h prior notice to SEACA, customs on PPR with 24 h prior notice. Business aviation terminal (FBO): winter season 1 Dec-30 Apr daily 07:30-21:00 local (tower 08:00-21:00 local); low season 1 May-30 Nov Mon-Fri 08:30-18:30 and Sat/Sun/holidays 09:00-18:00 local, extensions on request with 24 h notice

No published night curfew, but the airport is closed outside ATS hours (0700-2000 UTC per AIP; FBO closes 21:00 local in winter, 18:30/18:00 local in low season)
Distance

6.5 km

Aix-les-Bains (AIP: 3.5 NM SSW of Aix-les-Bains and 4.5 NM NNW of Chambéry)
Handling agents

1 on the airport

independent, no affiliation
GA terminal

Dedicated business aviation terminal ('Business Terminal') separate from the commercial passenger terminal, with its own published opening hours

What does Complete Detail at Chambéry Savoie Mont Blanc include?

The service begins with a full rinseless exterior wash—nacelles, belly, gear bays and winglets—followed by clay-bar decontamination to lift embedded rail dust, runway rubber and industrial fallout. A single-stage machine polish restores gloss to the topcoat, and brightwork—leading edges, exhaust surrounds, the cheat line if metal—is polished separately. Inside, every cabin surface is cleaned to OEM specification: leather is conditioned, carpets extracted, galley and lavatory disinfected, flight deck detailed with no-touch protocols around avionics and the glareshield. Cabin air vents, seat tracks and stowage compartments are vacuumed and wiped down. The final step is disinfection of high-contact surfaces throughout the aircraft.

A photographic report records the airframe before work starts and again after completion, providing documentation for the tech log, a pre-buy file or a sales prospectus. The entire process takes between two and five days, depending on airframe size, paint condition and whether you need the cabin fully stripped and reset. Most operators schedule Complete Detail once or twice a year, or immediately before an inspection, a delivery flight or a change of ownership.

What changes at Chambéry Savoie Mont Blanc for this work?

Chambéry sits at 779 feet in the French Alps, six and a half kilometres from Aix-les-Bains, and operates as a Level 2 schedules-facilitated airport during the winter season. The single paved runway—18/36, 2020 metres—handles the December-to-April surge in business aviation traffic that makes LFLB the third-busiest winter platform in France. ATS hours run 0700 to 2000 UTC (0600 on winter Saturdays), and the dedicated business aviation terminal keeps extended hours from early December through the end of April: 07:30 to 21:00 local daily, with the tower open 08:00 to 21:00. Outside that window—1 May to 30 November—the FBO closes at 18:30 on weekdays and 18:00 at weekends, and the airport requires 48 hours' notice for handling.

Every arrival during the winter peak must carry a COHOR slot authorisation obtained via the MyHandling portal and filed in the remarks field of the flight plan; the airport limits arrivals to five per hour on winter weekends and restricts Friday-to-Sunday overnight parking. Customs operates only on PPR with 24 hours' notice, so passenger and crew details must be filed a day ahead through MyHandling for any flight crossing into or out of France. There is no hangar space for visiting aircraft, which means Complete Detail is performed entirely outdoors on the apron, exposed to Alpine winter weather. Cold soaking, snow and wind are routine between December and April; we plan the work around forecast windows and coordinate closely with the handler to secure a stand that can be held for the full duration.

How do you time a Complete Detail between ski-season charter legs?

Most ultra-long-range and ACJ operators staging through Chambéry in winter are running weekly or twice-weekly charter rotations: Friday evening inbound from the Middle East or North America, Saturday morning positioning to Courchevel or Méribel by helicopter, Sunday evening return and a Monday departure slot. A two-day turnaround leaves no margin for a full detail, but a longer gap—three or four nights on stand—creates the opportunity to restore the aircraft to delivery condition without pulling it off the charter roster or repositioning south.

We ask for the slot authorisation and parking confirmation as soon as the handler confirms availability through MyHandling, then schedule the detail to start the morning after arrival and finish the afternoon before your next departure. If weather closes in—low cloud, snow or freezing overnight temperatures—we pause any work that requires open panels or extended exposure and resume when conditions improve. The photographic report timestamps every stage, so the chief pilot and the charter client both have a record that the aircraft left Chambéry in the condition it arrived or better. For one-off pre-buy or sale preparations, we recommend booking a five-day window outside the weekend peak, when slots are easier to secure and the apron is less congested.

What does the handler at LFLB expect from a third-party detailing crew?

Chambéry's business aviation handling is managed in-house by SEACA, part of VINCI Airports, and requested through the MyHandling portal or by email to handling@chambery-airport.com. The handler expects any third-party crew—whether maintenance, detailing or cabin refurbishment—to arrive with a valid airside escort arranged in advance, because unescorted access is not routinely granted to contract personnel. We hold current airside authorisation at LFLB and coordinate directly with the handler to confirm the stand assignment, GPU availability and any restrictions on water discharge or chemical use on the apron.

Before we start, the handler is given a copy of our insurance certificate, a brief scope of work and the captain's written authorisation. During the detail, we keep the aircraft on GPU or APU only with the flight crew's approval, and we notify the handler if we need to reposition the aircraft or if weather forces us to pause work overnight with panels open. All waste water from the rinseless wash is contained and disposed of in accordance with the airport's environmental procedures; we do not discharge directly onto the apron. When the work is finished, the handler receives a copy of the photographic report for the handling file, and the captain signs off the tech-log entry before departure.

Is Complete Detail at Chambéry recurring work or a one-off project?

It depends on how the aircraft is used. For a fleet operator running a dedicated ski-season charter programme out of LFLB—eight or ten weekly rotations between December and March—Complete Detail is typically scheduled once at the start of the season and again at the end, with interim dry washes every second or third turnaround. The first detail removes summer dust and prepares the cabin for high-value charter clients; the second, in late April, strips away four months of de-icing fluid residue, apron grime and salt spray before the aircraft repositions to its summer base.

For an owner-flown ultra-long-range jet or a BBJ visiting Chambéry once or twice a winter, the service is more often a one-off project: the aircraft arrives from the Middle East or the United States, spends seventy-two hours on stand while the family is in Courchevel, and the crew uses the window to bring the exterior and interior back to delivery standard before flying home. Pre-buy inspections and aircraft sales also drive one-off bookings; a buyer's surveyor is more confident, and a seller's asking price is easier to justify, when the airframe is documented in showroom condition on the ramp at a recognised European business aviation airport.

Why prepare an aircraft for sale or inspection at an Alpine winter airport?

Because the alternative is repositioning to southern Europe, losing a week of charter availability and paying for two extra sectors. Chambéry in winter is where the ultra-long-range and ACJ fleets actually are; moving an aircraft to Malta or Málaga for a detail, then returning it to LFLB for the next charter leg, doubles the cost and halves the revenue. If the aircraft is already on stand at Chambéry with a three- or four-day gap, it makes operational and financial sense to complete the detail there, even outdoors in January.

The photographic report is the key. A pre-buy surveyor or a prospective buyer wants to see the airframe in a known, dateable condition, and a time-stamped record of a Complete Detail at a recognised airport—paint polished, brightwork restored, cabin disinfected, all waste properly disposed of—provides exactly that. The report goes into the sales file or the inspection package, and the aircraft leaves Chambéry ready for a demo flight, a delivery leg or another month of charter without further preparation. For a chief pilot managing a winter programme out of LFLB, that is the difference between keeping the aircraft earning and taking it off the schedule for a week.

Questions operators ask about Complete Detail at Chambéry Savoie Mont Blanc

How long does Complete Detail take at Chambéry?

Between two and five days, depending on airframe size and paint condition. Most super-midsize and ultra-long-range jets are finished in three to four days. A large-cabin aircraft with heavy oxidation or an ACJ interior requiring full disinfection and carpet extraction may need the full five days. We confirm the timeline once we have seen the aircraft and the weather forecast.

Can you work outdoors at LFLB in winter?

Yes, but we pause if snow, freezing temperatures or high wind make it unsafe to open panels or apply chemicals. The detail is planned around forecast windows. Light snow or cold overnight temperatures do not stop the work, but we will not start a polish or open the cabin if conditions are forecast to deteriorate before we can close up. The photographic report documents any weather delays.

Do I need a slot authorisation for the aircraft to remain on stand during the detail?

Yes, every arrival at LFLB in the winter season requires a COHOR slot filed in the flight plan. The slot is obtained through the MyHandling portal and covers your arrival; once the aircraft is parked, the handler manages the stand assignment. If you are staying Friday to Sunday, be aware that weekend overnight parking is limited and must be requested in advance.

Is there hangar space at Chambéry Savoie Mont Blanc for this work?

No, the airport has no hangar space available for visiting aircraft. All detailing at LFLB is performed outdoors on the apron. We coordinate with the handler to secure a stand that can be held for the full duration, and we plan the work around weather windows to minimise exposure to snow or freezing conditions.

What documentation do you provide after the detail?

A photographic report showing the aircraft before and after, with timestamps for every stage of the work. The report is delivered digitally to the captain and the operator, with a copy to the handler for the handling file. It includes close-ups of the paint, brightwork, cabin surfaces and any areas that required extra attention, and it serves as a tech-log entry and a record for pre-buy or sales documentation.

Can you fit a Complete Detail into a weekend turnaround at Chambéry?

No, a weekend turnaround is too short; the service needs a minimum of two full days, ideally three or four. A Friday-evening arrival and Monday-morning departure leaves only Saturday and Sunday, which is not enough time for decontamination, polish and full interior work. We recommend booking a midweek gap or extending the stay by one or two nights to create the necessary window.

Do you need the flight crew present during the work?

No, but we do need written authorisation from the captain and contact details in case we have questions. Most crews leave the aircraft with us and return the day before departure for the final walk-around. If the captain prefers to stay, we coordinate each step—GPU use, panel access, cabin entry—so there are no surprises.

How do you dispose of waste water on the apron at LFLB?

All waste water from the rinseless wash is contained and disposed of in accordance with the airport's environmental procedures. We do not discharge directly onto the apron. The rinseless system uses minimal water, and what is used is captured and removed. The handler is notified of our waste-disposal method before we start work.

Can you detail the aircraft while it is cold-soaked after an overnight arrival?

We wait until the airframe has warmed to ambient temperature before starting any wash or polish work. Applying chemicals or polishing compound to a cold-soaked surface risks streaking, hazing or incomplete cleaning. If the aircraft arrives late evening, we begin work mid-morning the next day once the skin temperature has equalised. The delay is built into the schedule.

Is Complete Detail at Chambéry only for aircraft based there in winter?

No, it is also used by transient operators who need the aircraft in delivery condition before a sale, inspection or onward charter leg. Many one-off bookings come from crews staging through LFLB on a positioning flight or a charter rotation who recognise that a three-day gap is long enough to restore the aircraft without repositioning south. The service works equally well for recurring seasonal clients and for one-time projects.

Other services at Chambéry Savoie Mont Blanc